16.Equipment Maintenance 设备保养
滑轨/滑块保养:
X/Y轴三个滑轨和滑块需定期保养(一般为3-6个月),当滑轨表面缺润滑剂或者运动有异响时,表明滑块内滚珠缺润滑剂,
需在滑轨上涂润滑脂或润滑液。
Maintenance of sliding rails/ sliding blocks:
Three sliding rails and sliding blocks in the X/Y line should be periodically maintained (generally per 3-6 months).
When surfaces of sliding rails lack the lubricant or there is abnormal sound during the operation,
it means that balls in sliding blocks lack the lubricant and lubricating grease or lubricating fluid should be applied on the sliding rails.
26
Содержание Ender-7
Страница 1: ...Ender 7 3D打印机用户使用手册 3D Printer User Manual V1 1 创造现实 成就梦想 Create reality achieve dreams Ender 7 ...
Страница 2: ......
Страница 10: ...4 Install Profile 安装型材 05 Serrated lock washers x 1 外锯齿轮垫圈 22 24 Z轴组件 Z axis component 5 5 1 x 4 M5 18组合螺丝 18 ...
Страница 11: ...4 Install Profile 安装型材 06 Z axis profile Z轴型材 9 22 9 x 8 M5 18组合螺丝 18 ...
Страница 12: ...5 Install the Printing Platform 安装打印平台 07 8 13 ...
Страница 13: ...5 Install the Printing Platform 安装打印平台 08 4 13 ...
Страница 14: ...Serrated lock washers x 1 Top component 顶部组件 7 6 Install Top Component 安装顶部组件 09 x 4 M5 18组合螺丝 18 22 外锯齿轮垫圈 24 ...
Страница 15: ...6 Install Top Component 安装顶部组件 10 x 8 M5 18组合螺丝 18 22 ...
Страница 16: ...7 Install Filament Holder 安装料架 11 Filament Holder 料架 8 内六角平圆头螺丝M4 10 15 M4 10 Hexagon flat round head screw x2 ...
Страница 21: ...11 Bed Leveling 调平平台 20 20 0 20 0 20 0 0 16 ...
Страница 22: ...11 Bed Leveling 调平平台 17 使其与喷嘴处于刚好贴合状态 ...
Страница 23: ...11 Bed Leveling 调平平台 18 ...
Страница 24: ...12 Preheating 预热 200 200 20 0 20 0 20 0 20 0 20 0 20 0 20 0 20 0 19 0 0 28 30 0 0 28 30 ...
Страница 25: ...13 Load Filament 装料 14 14 20 ...
Страница 27: ...14 Start Printing 开始打印 252 252 302 252 252 302 22 ...
Страница 34: ...18 故障检修 29 ...
Страница 35: ......