18
CABLES
Disconnect the cable from the line. Also disconnect opposite end to
avoid errors due to leakage from other equipment. Check each
conductor to ground and /or lead sheath by connecting one
megohmmeter lead to a ground and / or lead sheather and the other
megohmmeter lead to each of the conductors in turn. Check insulation
resistance between conductors by connecting megohmmeter leads to
conductors in pairs.
Содержание ET2144
Страница 1: ...User s Guide ET2144 True RMS Industrial Multimeter...
Страница 2: ...1...
Страница 32: ...31...