35467-3-0320
Page 3
Empire Comfort Systems Inc. • Belleville, IL
11. Slide the new hose clamp over the “L” shaped end of the
metal condensate tube connected to the relay wire harness.
12. Insert the straight end of the metal condensate tube into the
partition panel and secure the condensate tube bracket with
the screw removed in step 10. Ensure that the condensate
tube discharges into the heated tray in front of the heat
exchanger tubes, and that the “L” shaped end of the tube is
pointed into the wall furnace.
See Figure 9.
Figure 9
13. Insert the “L” shaped end of the condensate tube into the
black condensate hose attached to the condensate trap.
Use the pliers to move the hose clamp to the portion of the
condensate hose which is over the condensate tube.
See
Figure 10.
Figure 10
14. Plug the connector from the heated tray’s wire harness into
the connector on the relay’s wire harness.
See Figure 11.
Figure 11
15. Plug the connector labeled “Condensate Accessory” from the
wall furnace’s control board wire harness into the connector
on the relay wire harness.
See Figure 12.
Figure 12
16. Reinstall the lower louver assembly. Make sure not to pinch
the heated tray wire harness.
17. Attach wiring diagram label provided with kit to the front of the
blower housing on the wall frame.
18.Turn the main power switch on and reinstall the wall furnace’s
front cover.