background image

24117-0-0508

Page 21

36”

MIN.

42”

MIN.

(CEILING TO

TOP OF HOOD)

1 3/4” MIN.

PERPENDICULAR

COMBUSTIBLE

SIDEWALL

36”

MIN.

42”

MIN.

(CEILING TO

TOP OF HOOD)

1 3/4” MIN.

PERPENDICULAR

COMBUSTIBLE

SIDEWALL

See Through Firebox Clearances

Peninsula Firebox Clearances

Premium Vent-Free Firebox Framing Dimensions (inches)

"A"

"B"

"C"*

Model

Framing Height

Framing Width

Framing Depth

VFP36SB

41 1/2"

40"

23"*

VFP36PB

41 1/2"

39"**

23"*

Attention: 

Add height of base to "A" Dimension when elevating firebox if 

installing on an elevated base.

Framing dimension A incudes a three inch clearance for standoffs on 

firebox.

Dimension "C" assumes use of 1/2" wall board flush to both front faces.

**  Peninsula model framing width assumes use of 1/2" wall board flush to 

the end face.

A

B

C

A

B

C

Framing - Peninsula

Framing - See-Through

Web Site: www.empirecomfort.com

The Breckenridge Premium Vent-Free Universal Fireboxes

SEE-THROUGH FIREBOX MODELS:

PENINSULA FIREBOX MODELS:

VFP36SB2EL-1

VFP36PB2EL-1

VFP36SB2EF-1

VFP36PB2EF-1

Empire Comfort Systems

918 Freeburg Avenue

Belleville, Illinois 62220-2623

Clearances (continued)

Framing

Содержание VFP36PB2EF-1

Страница 1: ...y or the gas supplier Carefully review the instructions supplied with the decora tive type unvented room heater for the minimum replace size requirement DO NOT INSTALL A VENT FREE LOG SET IN THIS FIRE...

Страница 2: ...ection 9 Wiring Instructions for Installing a Dual Switch Receptacle 10 LK2 Accent Light Accessory 10 Optional Single Speed Blower Installation Instructions 11 13 Maintenance 13 Parts List 14 See Thro...

Страница 3: ...val of such component part or accessory Any such action may create a possible re hazard Consult your local building codes Firebox Screen The rebox screen must be in place when the rebox is operating I...

Страница 4: ...top standoff screws on the front edge of the top outer wrap See Figures 2a and 2b CLEARANCES FIREBOX STAND OFF COMBUSTIBLE FINISHED WALL OR MANTEL 2 X 4 HEADER TOP OUTER WRAP FINISH WITH TRIM KIT OR N...

Страница 5: ...ALLOWED 22 8 20 6 18 5 16 3 14 2 24 0 FIREBOX FACE EXTENDED HOOD VB4H SERIES NOT AVAILABLE ON PENINSULA OPEN END 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX CLEARANCES Ceiling Clearanc...

Страница 6: ...dealer for assistance with this planning Planning Your Installation Accessory kits such as the FBB5 Blower kit Trim kits Mantles plus other Decorative Frame Hood and Door accessory kits may be install...

Страница 7: ...D 25 1 2 25 1 2 25 1 2 25 1 2 E 36 36 36 36 F 34 1 4 35 1 4 34 1 4 35 1 4 G 29 1 8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2...

Страница 8: ...rposes the hoods are located behind the upper louver s or inside the rebox on ush face units If brass stainless steel or hammered pewter hoods are desired they can be purchased as an option Attachment...

Страница 9: ...w c This is in addition to the regulator tted to the log set WARNING CONNECTION DIRECTLY TO AN UNREGULATED L P TANK CAN CAUSE EXPLOSION Install only a ANSI Z21 11 2 vent free log set into this rebox...

Страница 10: ...3 wire conductor with ground is recommended however 2 two wire conductors with grounds may be used in place of a 3 wire conductor with a ground if the black wires from the Accent Light and blower acc...

Страница 11: ...If installed turn OFF gas supply to rebox gas log 2 If applicable turn OFF electric supply to rebox CAUTION ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL LO...

Страница 12: ...mbly and retain wires together near the blower motor using the plastic purse clip provided 11 To complete the installation plug the power cord into the junction box receptacle previously installed in...

Страница 13: ...ROL SWITCH 1 2 A B 110 VOLT AC JUNCTION BOX WHITE FAN SWITCH BLACK FAN MOTOR ASSEMBLY Figure 18 Figure 19 Keep the control compartment logs and burner area surrounding the logs clean by vacuuming or b...

Страница 14: ...8807 18807 18807 18807 LOUVER ASSEMBLY UPPER 13 18808 18808 18808 18808 LOUVER ASSEMBLY LOWER 14 24059 24059 UPPER LOUVER ASSEMBLY 15 24058 24058 LOWER LOUVER ASSEMBLY 16 19990 19990 19990 19990 BLOWE...

Страница 15: ...24117 0 0508 Page 15 SEE THROUGH FIREBOX PARTS VIEW 1 2 3 4 5 8 7 8 9 11 12 13 16 17 18 19 20 22 7 24 23 27 23 12 13 9 11 24 20 19 18 27 17 3 4...

Страница 16: ...24117 0 0508 Page 16 PENINSULA FIREBOX PARTS VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 25 26 23 24 27 12 23 24 13 9 11 3 4 20 19 18 17...

Страница 17: ...ewter For use with See Through models VFP36SB2E L F ONLY Contact dealer for all available optional frame kits Bottom Trim Strip Available as optional kits in Black Brass Ham mered Pewter and Stainless...

Страница 18: ...and nishes Contact dealer for all available mantel options Flush Panel Kits Flush panel kits may be used to replace louvered panels as desired for the See Through and Peninsula rebox models Available...

Страница 19: ...8 29 1 8 29 1 8 29 1 8 H 41 1 8 41 1 8 41 1 8 41 1 8 I 1 1 4 1 1 4 1 1 4 1 1 4 J 6 1 8 6 1 8 6 1 8 6 1 8 K 8 1 2 8 1 2 8 1 2 8 1 2 L 6 6 6 6 M 27 5 8 27 5 8 27 5 8 27 5 8 N 36 7 8 36 7 8 36 7 8 36 7...

Страница 20: ...D 3 8 COMBUSTIBLE CLEARANCE REQUIRED FROM TOP EDGE OF FIREBOX Combustible material clearance from front of rebox 36 minimum Sidewall Clearances The clearance from the inside of the rebox to perpendicu...

Страница 21: ...Dimension when elevating rebox if installing on an elevated base Framing dimension A incudes a three inch clearance for standoffs on rebox Dimension C assumes use of 1 2 wall board ush to both front f...

Страница 22: ...24117 0 0508 Page 22 SERVICE NOTES...

Страница 23: ...24117 0 0508 Page 23 SERVICE NOTES...

Страница 24: ...Page 24 EMPIRE EMPIRE Comfort Systems Empire Comfort Systems Inc 918 Freeburg Ave Belleville IL 62220 PH 618 233 7420 or 800 851 3153 FAX 618 233 7097 or 800 443 8648 info empirecomfort com www empir...

Отзывы: