background image

4. 

Install heater around base of compressor. Tighten with 

5/16” socket.  See Figure 4.

5. 

Route Crankcase Heater wires through back panel to 

make terminations on control board (connect wires of 

Crank Case Heater to CCH labeled terminals). CCH is 

not polarized. See Figure 5.

NOTICE

Push connectors fully onto spade terminals. Use of 

needle nose pliers is recommended.

6. 

Wire tie loose wires.  See Figure 6.    

7. 

Replace panels.   

8. 

Re-connect power.

CRANKCASE HEATER KIT INSTRUCTIONS

Figure 3 - Wire Diagram Inside Control Box 

Cover

Figure 4 - Crankcase Heater Around Base of 

Compressor

Figure 5 - Crankcase Heater Wires To CCH 

Terminals

Wire Diagram Inside 

Control Door

Compressor

Crankcase Heater

S1CV 

S1CV 

Crankcase 
  Heater Wires 

Figure 6 - Wire Tie Loose Wires

Wire Ties

ECR INTERNATIONAL Inc
2201 Dwyer Avenue, Utica, NY, USA 13501

www.ecrinternational.com

Отзывы: