Emerson Process Management GmbH & Co. OHG
6-11
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2012
6
Software Menus
Calibration Status Summary
Cancel!
Calibration Status Single..
Current Action
Ready
Action Detail
Off
Current Duration
0 s
Prev. Duration
0 s
Current Step
0
6.2.2.3.2
Calibration Status Summary
6.2.2 Control Menu
Press
enter
in this line to cancel any ongoing
calibration
Information about the step currently carried
out
Indicates the currently ongoing procedure
(
Purging
,
Zeroing
,
Spaning
,
Ready)
Shows the remaining time for the current
procedure
Shows the time for the previous procedure
Shows the current procedure, or
Off
Open a submenu to see detailed calibration
status information for a specific component
(to be selected in a next step)
Control..
Advanced Calibration..
Status..
Содержание Rosemount X-Stream Series
Страница 370: ...Emerson Process Management GmbH Co OHG 7 82 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 ...
Страница 414: ...Emerson Process Management GmbH Co OHG 8 44 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 ...
Страница 486: ...Emerson Process Management GmbH Co OHG A 4 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 A 1 Modbus Specification ...
Страница 488: ...Emerson Process Management GmbH Co OHG A 6 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 A 1 Modbus Specification ...
Страница 490: ...Emerson Process Management GmbH Co OHG A 8 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 A 1 Modbus Specification ...
Страница 526: ...Emerson Process Management GmbH Co OHG A 44 X STREAM XE Instruction Manual HASXEE IM HS 10 2012 ...
Страница 535: ......