Reference Manual
300520EN, Rev AA
November 2009
Rosemount 5900 Series
3-18
Section 3. Installation
3.3 MECHANICAL
INSTALLATION
3.3.1
Horn Antenna
Follow this instruction when installing the Rosemount 5900 with Horn
Antenna. See “Horn Antenna Requirements” on page 3-4 for information on
mounting considerations before installing the gauge on the tank.
NOTE!
When determining conduit dimensions (if used), note that the Horn Antenna
Gauge may be inclined 4° towards the center of the tank (see Figure 3-2 on
page 3-5). Use flexible conduits close to the Radar Tank Gauge.
1. Check that all parts and tools are
available before carrying them up to
the tank roof.
2. Put a gasket on the socket and
carefully insert the horn antenna and
flange assembly.
3. Tighten the flange onto the socket by
using suitable screws and nuts
(customer supplied).
4. Put the adapter on the flange.
Tighten the four M10 screws with
washers by hand so that the adapter
can be rotated.
Horn antenna and
flange assembly
Gasket (Customer supplied)
Customer supplied
flange
Nozzle
Adapter
Four M10 screws and
washers
Preliminary
Содержание Rosemount 5900
Страница 2: ...Preliminary ...
Страница 4: ...Preliminary ...
Страница 14: ...Reference Manual 300520EN Rev AA November 2009 Rosemount 5900 Series 1 6 Section 1 Introduction Preliminary ...
Страница 24: ...Reference Manual 300520EN Rev AA November 2009 Rosemount 5900 Series 2 10 Section 2 Overview Preliminary ...
Страница 90: ...Reference Manual 300520EN Rev AA November 2009 Rosemount 5900 Series 4 16 Section 4 Configuration Preliminary ...