![Emerson Rosemount 5081FG Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/emerson/rosemount-5081fg/rosemount-5081fg_reference-manual_101186037.webp)
Reference Manual
00809-0100-4882, Rev AB
May 2019
Rosemount 5081FG
Section 3
Startup and Operation
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-1
Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-1
Establishing Proper Calibration Gas Flow Rate . . . . . . . page 3-3
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-4
Program Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-7
Diagnostics Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-16
Cal Check Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-21
GENERAL
Verify Mechanical Installation
Ensure the Two-Wire In-Situ Oxygen Analyzer is installed correctly. See
Mechanical Installation in Section 2: Installation for mechanical installation
information.
Verify Terminal Block Wiring
Ensure the wiring of both the oxygen probe terminal block and Rosemount
5081 transmitter terminal block is correct. Refer to Electrical Installation in
Section 2: Installation for electrical installation and wiring information.
POWER UP
General
The Two-Wire In-Situ Oxygen Analyzer displays the current oxygen reading
on the LCD face of the Rosemount 5081 transmitter. The O
2
concentration,
cell temperature, and 4-20 mA output current are displayed as shown in
Figure 3-1. This and other information may also be accessed using
HART/AMS.
Startup Display
When the probe is first inserted into the stack, some time is required until the
minimum operating temperature [550°C (1022°F)] is reached. Some time is
also required for the electronics to reach an operating state. Therefore, when
the unit is first powered up, a faulted operation display as shown in Figure 3-2
may be displayed by the transmitter until the probe operating temperature is
reached and the electronics are working properly (approximately 5 minutes).
Install all protective equipment covers and safety ground leads before equipment startup.
Failure to install covers and ground leads could result in serious injury or death.
Содержание Rosemount 5081FG
Страница 2: ......
Страница 6: ...Reference Manual 00809 0100 4882 Rev AB June 2019 Rosemount 5081FG TOC 4 ...
Страница 20: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 1 10 ...
Страница 23: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 2 3 Figure 2 1 Probe Installation Details ...
Страница 26: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 2 6 Figure 2 4 Horizontal Probe Installation ...
Страница 29: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 2 9 Figure 2 7 Pipe Mounting Dimensions ...
Страница 36: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 2 16 ...
Страница 41: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 3 5 Figure 3 5 Transmitter Menu Tree ...
Страница 53: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 3 17 Figure 3 20 Show Fault ...
Страница 81: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 6 5 Figure 6 2 Oxygen Probe Terminal Block ...
Страница 82: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG 6 6 ...
Страница 94: ...Reference Manual 00809 0100 4882 Rev AB May 2019 Rosemount 5081FG A 8 ...
Страница 96: ...Reference Manual 00809 0100 4882 Rev AB June 2019 Rosemount 5081FG B 2 ...
Страница 97: ...Reference Manual 00809 0100 4882 Rev AB June 2019 Rosemount 5081FG EC Declaration of Conformity ...
Страница 98: ...Reference Manual 00809 0100 4882 Rev AB June 2019 Rosemount 5081FG B 2 ...
Страница 100: ......
Страница 103: ...Index 2 ...