62 Installation Drawings
Figure 43 Control Wiring, 1+1 Twisted-Pair Cable Connection
CONTROL WIRING
NPOWER 1+1 MODULE CONTROL CONNECTIONS
TWISTED PAIR CABLE CONNECTION
NPOWER
M MIERSEN
REF. DWG.
CHK BY
DRAWN BY
FILE NAME: Npower\Drawings\O1\U3713026\(D)
REV. NO.
DWG. NO.
U3713026
DATE
6/17/03
1050 DEARBORN DRIVE
COLUMBUS, OHIO 43229
4
4
R
R
3. BOTH UPS MODULES MUST BE CONFIGURED FOR 1+1 OPERATION. SEE OPTIONS MANUAL
4. CONTROL WIRING (BY OTHERS) MUST BE RUN SEPARATE FROM THE POWER WIRING.
CONTROL WIRING RUNS SHOULD NOT BE COMBINED IN THE SAME CONDUIT.
5. REFER TO UPS MODULE CONNECTION LOCATION DIAGRAM FOR LOCATION OF IFM OPTION BOARD.
CONTROL WIRING RUNS SHOULD NOT BE COMBINED IN THE SAME CONDUIT.
6. ALL WIRING MUST BE IN ACCORDANCE WITH NATIONAL AND LOCAL ELECTRIC CODES.
TWISTED PAIR CONDUCTORS AS SHOWN, OR BY CATEGORY-5 ETHERNET PATCH CABLE, SHOWN ON
ONLY ONE CONTROL CABLE GROUP REQUIRED BETWEEN MODULES. CONNECTION CAN BE MADE VIA
1. MODULE TO MODULE INTERCONNECTION CABLE ILLUSTRATED IS FOR TWISTED PAIR TERMINAL WIRING.
2. MAXIMUM TWISTED PAIR WIRE LENGTH IS 100 FEET. TERMINAL STRIP ACCOMODATES 18 - 22 AWG
STRANDED AND SHIELDED CABLE. 22 AWG CABLE RECOMMENDED.
T
B
5
7
9
B
1
0
6
5
8
7
B
R
R
B
9
B
1
0
7
B
R
8
B
R
5
6
T
B
5
7
FOR DETAILS.
NOTES:
IFM BOARD DETAIL
6
5
BOARD
UPS #1
2
3
1
B
R
6
7
8
IFM
1
3
4
2
J
3
7
8
1
3
2
5
4
J
2
6
IFM
BOARD
UPS #2
5
1
B
3
2
R
8
7
6
2
4
3
1
8
7
J
3
1
4
5
2
3
J
2
CONTROL WIRING ILLUSTRATION
DWG# U37017. UPS SHIPS WITH A 25-FOOT CAT-5 PATCH CABLE FOR CUSTOMER USE. FOR APPLICATIONS
REQUIRING LONGER CABLE LENGTH, THE TWISTED PAIR CONDUCTORS OR A LONGER CAT-5 CABLE IS
REQUIRED. PROVIDED BY OTHERS.
Содержание Liebert Npower 30-130 kVA
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 40: ...30 Installation Drawings 11 0 INSTALLATION DRAWINGS Figure 11 Outline Drawing 30 50 kVA UPS ...
Страница 41: ...Installation Drawings 31 Figure 12 Outline Drawing 65 80 kVA UPS ...
Страница 42: ...32 Installation Drawings Figure 13 Outline Drawing 100 130 kVA UPS ...
Страница 45: ...Installation Drawings 35 Figure 16 Outline Drawing Maintenance Bypass Cabinet L Configuration ...
Страница 46: ...36 Installation Drawings Figure 17 Outline Drawing Maintenance Bypass Cabinet N Configuration ...
Страница 47: ...Installation Drawings 37 Figure 18 Outline Drawing Maintenance Bypass Cabinet P Configuration ...
Страница 48: ...38 Installation Drawings Figure 19 Outline Drawing Maintenance Bypass Cabinet Q Configuration ...
Страница 58: ...48 Installation Drawings Figure 29 Outline Drawing Seismic Anchoring 30 50 kVA UPS ...
Страница 59: ...Installation Drawings 49 Figure 30 Outline Drawing Seismic Anchoring 65 80 kVA UPS ...
Страница 60: ...50 Installation Drawings Figure 31 Outline Drawing Seismic Anchoring 100 130 kVA UPS ...
Страница 61: ...Installation Drawings 51 Figure 32 Outline Drawing Remote Battery Breaker 30 130 kVA ...
Страница 62: ...52 Installation Drawings Figure 33 Outline Drawing Remote Battery Breaker with Motor Operator 30 130 kVA ...
Страница 63: ...Installation Drawings 53 Figure 34 Outline Drawing Remote Battery Breaker with BIB Installed ...
Страница 64: ...54 Installation Drawings Figure 35 Outline Drawing Remote Alarm Status Panel ...
Страница 65: ...Installation Drawings 55 Figure 36 Outline Drawing LBS Control Panel ...
Страница 66: ...56 Installation Drawings Figure 37 Outline Drawing LBS Alarm Status Contacts ...
Страница 67: ...Installation Drawings 57 Figure 38 Outline Drawing LBS Transformer Panel ...
Страница 68: ...58 Installation Drawings Figure 39 Control Wiring LBS Interconnection Wiring Diagram for Configs A B R S ...
Страница 69: ...Installation Drawings 59 Figure 40 Control Wiring LBS Interconnection Wiring Diagram for Configs D E ...
Страница 70: ...60 Installation Drawings Figure 41 Control Wiring 30 130 kVA UPS ...
Страница 73: ...Installation Drawings 63 Figure 44 Control Wiring Remote Alarm Status Panel Option ...
Страница 74: ...64 Installation Drawings Figure 45 Control Wiring 2 or 3 Remote Alarm Status Panels ...
Страница 75: ...Installation Drawings 65 Figure 46 Control Wiring 3 Remote Alarm Status Panels with Stub Connections ...
Страница 76: ...66 Installation Drawings Figure 47 Control Wiring Site Scan Interface ...
Страница 77: ...Installation Drawings 67 Figure 48 Control Wiring Programmable Relay Board Option ...
Страница 78: ...68 Installation Drawings Figure 49 Control Wiring Input Contact Isolator Board ...
Страница 79: ...Installation Drawings 69 Figure 50 Control Wiring NIC Option ...
Страница 80: ...70 Installation Drawings Figure 51 Control Wiring Power Supply Option ...
Страница 81: ...Installation Drawings 71 Figure 52 Control Wiring Internal Modem Option ...
Страница 82: ...72 Installation Drawings Figure 53 Control Wiring AS 400 Signal Cable Option ...
Страница 83: ...Installation Drawings 73 Figure 54 Control Wiring Open Wire Cable Adaptor Option ...
Страница 84: ...74 Installation Drawings Figure 55 Control Connection Diagram 50 130 kVA ...
Страница 85: ...Installation Drawings 75 Figure 56 Control Connection Location Diagram 30 130 kVA UPS ...
Страница 86: ...76 Installation Drawings Figure 57 Terminal Details 30 50 kVA UPS ...
Страница 87: ...Installation Drawings 77 Figure 58 Terminal Details 65 80 kVA UPS ...
Страница 88: ...78 Installation Drawings Figure 59 Terminal Details 100 130 kVA UPS ...
Страница 89: ...Installation Drawings 79 Figure 60 Schematic Diagram Maintenance Bypass Interlock System ...
Страница 90: ...80 Installation Drawings Figure 61 Schematic Diagram Maintenance Bypass Interlock System with EPO ...
Страница 91: ...Installation Drawings 81 Figure 62 Line Up Detail Maintenance Bypass and Distribution Cabinets ...
Страница 92: ...82 Installation Drawings Figure 63 Wiring Diagram UPS with Single Battery Cabinet ...
Страница 93: ...Installation Drawings 83 Figure 64 Interconnection Diagram UPS Module with Multiple Battery Cabinets ...
Страница 94: ...84 Installation Drawings Figure 65 Circuit Breaker Schedule Maintenance Bypass Cabinet 30 130 kVA ...
Страница 98: ...88 ...
Страница 99: ......