![Emerson Level-Trol 2500 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/emerson/level-trol-2500/level-trol-2500_instruction-manual_2400763028.webp)
Type 2500
Instruction Manual
Form 1013
December 2005
28
Figure 15. Bourdon Tube-Flapper Arrangements for Various Actions and Mountings
AC9554
AR8148
BO996
−
1/IL
0.2 to 1 bar or 0 to 1.4 bar (3 to 15 psig or 0 to 20
psig) range. Use a tube with a red color code for a
0.4 to 2 bar or 0 to 2.4 bar (6 to 30 psig or 0 to 35
psig) range. The range is stamped at the Bourdon
tube base.
4. Mount the Bourdon tube on the level set arm (key
28). Secure it with the mounting screws, using the
proper orientation as shown in figure 15. Connect
the tubing to the tube base, with tubing from the R
connection on the relay (key 34) going to the marked
base connection. The other tubing goes to the
unmarked base connection. With an indicator
assembly, install the pointer assembly on the rotary
shaft and tighten the hex nut.
5. Perform the calibration procedure.
Changing Action
Note
The following procedure is necessary
to restore previous action if the
mounting method has been changed.
1. Reposition the Bourdon tube (and indicator
assembly, if used) according to steps 1 through 4 of
the Replacing the Bourdon Tube section.
2. Loosen the hex nut (key 40) and remove the
flapper base (key 30) from the torque tube rotary
shaft. Turn the flapper base over and install it on the
rotary shaft, using the proper orientation as shown in
figure 15 and making sure the flapper is centered
over the nozzle or Bourdon tube valve.
3. Perform the calibration procedure.