Warning

!

To avoid personal injury, property 

damage or equipment damage caused by 

sudden release of pressure or explosion 

of accumulated gas, do not attempt any 

maintenance or disassembly without 

first isolating the regulator from system 

pressure and relieving all internal 

pressure from the equipment. 

Vacuum regulators that have been 

disassembled for repair must be 

tested for proper operation before 

being returned to service. Only 

parts manufactured by regulator 

Technologies should be used for 

repairing Fisher

®

 vacuum regulator. 

restart gas utilization equipment 

according to normal startup procedures.

general Maintenance

1.  Visually inspect the vacuum regulators and its 

parts for any damage.

2.  Ensure tight connections, tight seals and safe 

operation. If there is an evidence of leakage 

or unstable internal motion, a rebuild with seal 

replacement and relubrication may be necessary.

3.  Observe the controlled upstream vacuum pressure 

and downstream vacuum source pressure.

Body area

To gain access to the disk assembly and body gasket, 

follow this procedure. Before the following steps can be 

performed, release all pressure from the diaphragm case.

Key numbers are referenced in Figures 3 and 4.

1.  To inspect and replace the disk holder assembly 

(key 13), remove the body cap assembly (key 43).

2.  If it is necessary to replace the disk holder 

assembly (key 13), remove it from the disk spacer 

(key 44).

3. 

To inspect the orifice (key 5) on Types T208VR 

and T208VRM or throat seal O-ring (key 31) and 

machine screw (key 34) on the Type T208VRM, 

remove the cap screws (key 2) and separate the 

lower casing (key 4) from the body (key 1).

4. 

Remove and inspect the body seal O-ring (key 11). 

For Type T208VRM, also inspect the throat seal 

O-ring (key 31) by removing the machine screw 

(key 34). Replace if necessary. To install a throat 

seal, place the O-ring on the machine screw and 

thread into guide insert (key 18) to seal.

5. 

Inspect the orifice (key 5) by carefully running your 

finger along the edges to check for nicks or dents; 

replace if necessary. Lightly lubricate the threads 

of the replacement orifice with a good grade of light 

grease and tighten using 340 to 470 inch-pounds / 

38.5 to 53.1 N•m. 

6.  If necessary, install the replacement backup ring 

(key 49) and body seal O-ring (key 11) into the 

body (key 1).

7. 

Replace the body (key 1) on the diaphragm casing 

(key 4) and secure with the cap screws (key 2) using 

90 to 126 inch-pounds / 10.2 to 14.2 N•m of torque.

note

The disk holder assembly (key 13) is 

comprised of the disk and disk holder. 

8. 

Install the disk holder assembly (key 13) and 

secure it to the disk spacer (key 44).

9. 

Place the back disk spring (key 41) and a new 

back body seal O-ring (key 11) on the back body 

cap (key 43).

10. Lightly lubricate the threads when replacing the 

body cap assembly. Use 340 to 470 inch-pounds / 

38.5 to 53.1 N•m of torque.

Diaphragm and Spring Case area

To gain access to the control spring, diaphragm 

assembly, valve stem and stem O-ring, follow this 

procedure. All pressure must be released from the 

diaphragm case before performing the following steps.

Содержание FISHER T208VR Series

Страница 1: ...vice applications where a constant vacuum must be Figure 1 Type T208VR Vacuum Regulator Table of Contents Introduction 1 Specifications 2 Principle of Operation 2 Installation 4 Startup Adjustment and Shutdown 5 Maintenance 5 Parts Ordering 9 Parts List 9 maintained These direct operated vacuum regulators come in 3 4 and 1 inch DN 20 and 25 body sizes and have a 7 16 inch 11 mm orifice and a 1 4 i...

Страница 2: ...tration Type T208VRM Direct operated vacuum regulator with blocked throat and control line connection for external pressure registration Body Sizes and End Connection Styles 1 BODY SIZE END CONNECTION STYLES Inch DN Gray cast iron 316L 316 Stainless steel 3 4 or 1 20 or 25 NPT NPT or CL150 RF Maximum Casing Pressure 1 35 psig 2 41 bar Maximum Casing Vacuum Pressure 1 Full Vacuum Maximum Allowable ...

Страница 3: ... SOURCE ATMOSPHERIC PRESSURE INLET PRESSURE CONTROLLED VACUUM OUTLET PRESSURE HIGHER VACUUM SOURCE ATMOSPHERIC PRESSURE VACUUM BEING CONTROLLED HIGHER VACUUM SOURCE VACUUM PUMP ADJUSTING NUT CONTROL SPRING VENT PIPE PLUG PUSHER POST STEM LEVER DIAPHRAGM VALVE PLUG DISK ORIFICE ADJUSTING NUT CONTROL SPRING VENT PUSHER POST STEM STEM SEAL THROAT SEAL LEVER DIAPHRAGM CONTROL LINE CONNECTION PORT VALV...

Страница 4: ...lled in any position as long as the flow through the body is in the direction indicated by the arrow attached to the body If continuous operation is required during inspection or maintenance install a threeway bypass valve around the equipment 3 To keep the vent assembly key 26 from being plugged or the spring case key 3 from collecting moisture corrosive chemicals or other foreign material point ...

Страница 5: ...essure gauges to monitor inlet pressure and outlet pressure during startup and adjustment procedures Startup 1 Slowly open the downstream outlet shutoff valve if used to vacuum regulator and leave it fully open 2 Slowly open the upstream inlet shutoff valve for Type T208VRM open the control line shutoff valve first followed by the upstream shutoff valve between the tank and vacuum regulator 3 Use ...

Страница 6: ...rifice key 5 on Types T208VR and T208VRM or throat seal O ring key 31 and machine screw key 34 on the Type T208VRM remove the cap screws key 2 and separate the lower casing key 4 from the body key 1 4 Remove and inspect the body seal O ring key 11 For Type T208VRM also inspect the throat seal O ring key 31 by removing the machine screw key 34 Replace if necessary To install a throat seal place the...

Страница 7: ... screws key 24 and hex nuts key 23 to fingertightness only 11 Install the upper spring seat key 19 and the adjusting nut key 20 Turn the adjusting nut clockwise until there is enough control spring key 6 force to provide proper slack to the diaphragm key 10 and attached parts Using a crisscross pattern finish tightening the spring case cap screws key 24 and hex nuts key 23 to 90 to 126 inch pounds...

Страница 8: ...sing cap key 22 To Convert Constructions The Type T208VR to the Type T208VRM New parts required keys 30 31 and 34 1 Remove pipe plug key 27 Figure 3 from the diaphragm casing key 4 2 Refer to steps 1 and 3 in the Body Area Maintenance section 3 Insert the throat seal O ring key 31 Figure 4 and one machine screw key 34 4 Insert the stem seal O ring key 30 by following steps 1 through 7 and 9 throug...

Страница 9: ...450X012 46 Nameplate 47 Drive Screw 4 required 18 8 Stainless steel 1A368228982 48 Flow Arrow 49 Backup Ring 302 Stainless steel 18B3446X012 51 Connector Thread Stud Steel 17B9741X012 stamped on the nameplate Specify the eleven character part number when ordering new parts from the following parts list Parts List Key Description Part Number Spare parts kit included are keys 10 11 12 25 42 and 45 N...

Страница 10: ...ly ERSA02741 APPLY LUBRICANT 1 L1 SILICONE GREASE L2 ANTI SEIZE COMPOUND 1 Lubricants must be selected such that they meet the temperature requirements 7 36 25 19 20 51 6 21 18 14 13 41 5 L2 L2 10 7 45 8 16 17 12 11 49 44 42 L1 L1 L1 4 27 23 24 26 46 22 47 43 48 1 2 3 ...

Страница 11: ...A02742 APPLY LUBRICANT 1 L1 SILICONE GREASE L2 ANTI SEIZE COMPOUND 1 Lubricants must be selected such that they meet the temperature requirements L1 10 7 45 8 16 17 30 12 11 49 44 13 L1 L1 L1 42 L1 7 36 25 19 51 20 6 21 14 41 18 31 34 5 L2 L2 4 46 23 24 26 22 2 1 48 43 47 3 ...

Страница 12: ...ser industrial regulators Emerson Process Management regulator Technologies inc USA Headquarters McKinney Texas 75070 USA Tel 1 800 558 5853 Outside U S 1 972 548 3574 Asia Pacific Shanghai 201206 China Tel 86 21 2892 9000 Europe Bologna 40013 Italy Tel 39 051 419 0611 Middle East and Africa Dubai United Arab Emirates Tel 011 971 4811 8100 natural gas Technologies Emerson Process Management regula...

Отзывы: