5
Installation prerequisites
Topics covered in this chapter:
•
•
•
Tools required for LME disassembly/assembly
5.1
Pre-start checks
1.
Inspect all electrical connections to ensure compliance to electrical codes and safety
regulations.
2.
Inspect all bolts used to secure the turbine meter in line to ensure that correct
mounting procedures have been followed and that flange connections are leak-free.
3.
Evaluate the system setup to ensure that all components are in the correct sequence
for accurate product measurement: isolation valve, strainer, flow straightener,
turbine meter, downstream section, control valve, etc.
4.
Ensure that the supply voltage to the preamplifier is within the 10-30 VDC range.
5.2
Torque information
Important
Ensure that piping or other attachments connected to the turbine meter are not under stress.
NOTICE
When installing this equipment, bolting must conform to the requirements of ASME B16.5
paragraph 5.3 and to the material requirements of ASME B16.5 Table 1B. Gaskets must
conform to the requirements of ASME B16.20. This is applicable for class 150 to 2500. Consult
factory for higher nominal pressure.
Important
When installing flange, follow the customer's best internal practice procedures.
5.3
Tools required for LME disassembly/assembly
Use the following tools for disassembly/assembly of the turbine meter electronics (LME):
•
6 mm Allen key
•
3 mm Allen key
•
2.5 mm Allen key
Installation prerequisites
User manual
57
Содержание daniel 1500 series
Страница 1: ...User manual P N 3 9008 515 Rev D July 2016 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 8: ......
Страница 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 75: ...Part III Operate Operate User manual 65 ...
Страница 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 101: ...Decommission the turbine meter User manual 91 ...
Страница 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 103: ...Decommission the turbine meter User manual 93 ...