Typical installation for the RME
Figure 4-6:
4.3.8
Install the security seal
Security seals protect the integrity of the turbine meter metrology and prevent
preamplifier and pickoff tampering. Follow the steps below to seal the electronics
enclosure of the Daniel 1500 LTM after commissioning. The security seal wires are
commercially available.
CAUTION!
CUTTING HAZARD
Sharp edges may be present on the band shrouds. Wear appropriate personal protective
equipment when working on the turbine meter.
Failure to comply may cause serious injury.
Prepare the turbine meter for use
52
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
Содержание daniel 1500 series
Страница 1: ...User manual P N 3 9008 515 Rev D July 2016 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 8: ......
Страница 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 75: ...Part III Operate Operate User manual 65 ...
Страница 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 101: ...Decommission the turbine meter User manual 91 ...
Страница 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 103: ...Decommission the turbine meter User manual 93 ...