4.3.6
LME communication connectivity restrictions
The pickoff input signal connections are made at terminal strip connection TB2 for
Channel A, and TB3 for Channel B. Power supply and output signal connections are made
at terminal strip TB1. Refer to
,
,
and
.
Important
•
For single channel wiring use multi-conductor control and instrumentation cable (18AWG), or
equivalent.
•
Earth ground shield at one end only.
•
Insulate the shield at the other end.
•
For dual channel wiring use multi-conductor control and instrumentation cable (18AWG), or
equivalent.
•
Connect both shields to earth ground at one end of the cables and insulate the shields at the
other end.
•
The LME housing should be at earth ground.
4.3.7
RME communication connectivity restrictions
The RME must follow all the connectivity restrictions that are applicable to the LME as well
as the transmission distance restrictions listed on
.
Installation dimensions for the RME
Table 4-4:
Device
Transmission distance
Pickoff to RME
6.1 meters (20 ft.) maximum from RME dual channel
Preamplifier to receiver
1525 meters (5,000 ft.) maximum
Prepare the turbine meter for use
User manual
51
Содержание daniel 1500 series
Страница 1: ...User manual P N 3 9008 515 Rev D July 2016 Daniel Series 1500 Liquid Turbine Meter NPS 3 through 24 ...
Страница 8: ......
Страница 12: ...Plan 2 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 64: ...Prepare the turbine meter for use 54 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 66: ...Install 56 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 72: ...Installation procedure 62 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 74: ...Testing 64 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 75: ...Part III Operate Operate User manual 65 ...
Страница 76: ...Operate 66 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 80: ...Maintain 70 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 101: ...Decommission the turbine meter User manual 91 ...
Страница 102: ...Decommission the turbine meter 92 Daniel Series 1500 Liquid Turbine Meter NPS 3 24 ...
Страница 103: ...Decommission the turbine meter User manual 93 ...