manualshive.com logo in svg
background image

2 • Included In This Package

026-1306 Rev 0 12-04-02

known, securely grounded object.

• Do not handle the printed circuit board without 

proper protection against static discharge. Use a 
wrist strap when handling PCBs. The wrist strap 

clamp must be secured to earth ground.

1.3.3. General Precautions

Do not remove the ISIS’s metal cover—no user-ser-

viceable parts are inside. Removal of the cover will void 
the warranty.

1.4. Included In This Package

Included in this package you should find the follow-

ing items:

• An  ISIS

• A packing slip, which lists the factory settings for IP 

address, machine name, and host log on

• ISIS Installation Instructions

• 3-conductor power cord

• Wall-mounting brackets (2)

• Hardware bag including miscellaneous screws, an 

extra fan filter, and rubber feet for desktop mount

• Optional items (if ordered):

-

 NP-UP-OS option: Full Windows NT Worksta-

tion software media (diskettes and CD) and li-
cense.

-

 MDM-NP option: Factory-installed modem. In-

cludes a six-foot phone cable. Note that this op-
tion also requires the NP-UP-OS (full NT) option.

-

 NP-485 option: factory-installed dual-port RS-

485 adapter. Ports are DB-9P (plug) types, which 
require customer-supplied cables with DB-9S 

(socket) ends to connect to the ISIS.

1.5. Compatibility

ISIS Compatibility with the CPC REFLECS and Ein-

stein product lines:

 

1.6. Installation and Start-Up

Read through the entire document before beginning 

the installation procedure.

1.6.1. Unpack the ISIS

Unpack the ISIS and inspect the contents of the pack-

age for damaged or missing components. If damaged, 
notify the appropriate carrier at once and return any dam-
aged components for immediate repair or replacement.

1.6.2. Install the ISIS

Installing the ISIS has four major steps:

1. Physical installation

2. Power Requirements

3. Power up and initial checkout

4. Connect to the ISIS

1.6.2.1.

Physical Installation

Tools Required

The following tools and supplies may be required for 

installation:

• Appropriate nut driver or screwdriver (to install the 

mounting brackets, if used)

• Small flat-blade screwdriver (for LON connector)

Table 1-1

 ISIS Compatibility

Controller

Supported Y/N

REFLECS (Standard)

No

RMCC version 2.16 
and higher

Yes

BCU version 2.20 and 
higher

Yes

BEC version 4.14 and 
higher

No

Einstein RX version 
1.5F01 and higher

Yes

Einstein BX version 
1.5F01 and higher

Yes

NOTE: For any ISIS compatibility questions, 
contact CPC at 1-800-829-2724.

Table 1-1

 ISIS Compatibility

Controller

Supported Y/N

Содержание CPC ISIS

Страница 1: ...026 1306 Rev 0 12 04 02 In Store Information Server ISIS Installa tion and Configuration Guide ...

Страница 2: ......

Страница 3: ...s Inc be liable for any direct indirect special incidental or consequential damages resulting from any defect or omission in this manual even if advised of the possibility of such damages In the interest of continued product development Computer Process Controls Inc reserves the right to make improvements to this manual and the products described herein at any time without notice or obligation REA...

Страница 4: ......

Страница 5: ...UP AND INITIAL CHECKOUT 4 1 11 WIRING DETAILS 4 1 11 1 Ethernet 4 1 11 2 Serial 4 1 11 3 Modem Optional 4 1 12 FIGURES 5 1 12 1 ISIS Connector Layout 5 1 12 2 Mounting Detail 6 1 13 RS 485 OPTION 6 1 14 WIRING DETAILS 7 1 15 CABLE DIAGRAMS 7 1 15 1 RS 485 Full Duplex 7 1 15 2 RS 485 Half Duplex 7 1 16 MAINTENANCE 8 1 16 1 Filter Maintenance 8 1 16 2 Real Time Clock Battery 8 1 17 REPLACEMENT PARTS...

Страница 6: ......

Страница 7: ...oes not directly support user changes to many Windows settings except IP address 1 3 Precautions 1 3 1 Safety Precautions The following items are warnings of a general nature relating to the installation and start up of the ISIS control ler Be sure to heed these warnings to prevent personal injury and or equipment damage A 120VAC or 240VAC for international units cir cuit powers the ISIS controlle...

Страница 8: ... plug types which require customer supplied cables with DB 9S socket ends to connect to the ISIS 1 5 Compatibility ISIS Compatibility with the CPC REFLECS and Ein stein product lines 1 6 Installation and Start Up Read through the entire document before beginning the installation procedure 1 6 1 Unpack the ISIS Unpack the ISIS and inspect the contents of the pack age for damaged or missing componen...

Страница 9: ... situated to wards the top of the cabinet 1 8 Power Requirements The power connector of the ISIS must be connected to a dedicated 120VAC 60Hz circuit capable of providing at least 1 5 Amperes plus sufficient capacity for test equip ment International units must be wired to a 240VAC 50Hz source of power capable of providing at least 0 75 Amperes plus sufficient capacity for test equipment Domestic ...

Страница 10: ...s connection is capable of running at either 10 Mbps or 100 Mbps it automatically adjusts to either speed This means the ISIS can exist on the same network with a mixture of 10BaseT and 100BaseTX hardware con nected to a smart 10 100 hub capable of adjusting to the devices it supports 1 11 2 Serial There are two RS 232 serial ports on the ISIS labeled COM1 and COM2 These are DTE type ports using i...

Страница 11: ... LED HDD LED PRINTER PHONE LINE COM3 O I 1 2 3 4 Power Connector Power Switch KEYBOARD MOUSE Ethernet 10BaseT LON Trunk FTT 10 VIDEO PRINTER COM1 PHONE LINE COM3 COM2 COM1 COM2 RS 232 COM1 RS 232 COM2 Ethernet RJ 45 Printer LPT1 LON FTT 10 RS 485 port COM3 RS 485 port COM4 RS 485 option model NP 485 has two DB 9P male connectors and is typically located in slot 2 See Section 1 13 RS 485 Option for...

Страница 12: ...ory installed RS 485 adapter located in slot 2 Figure 1 2 This is a dual port adapter with two standard male DB 9 plug male connectors Figure 1 3 ISIS top view RS 485 Option Table 1 3 COM Port Assignments for RS 485 Ports on an ISIS RS 485 Option RS 485 Adapter COM Port Assignments Top DB 9 Connector COM3 Bottom DB 9 Con nector COM4 ...

Страница 13: ...e to connect the ISIS using RS 485 full duplex 1 15 2 RS 485 Half Duplex An RS 485 bus wired for half duplex is commonly known as a two wire bus Cabling between devices uses three 3 conductors a single twisted pair plus a shield ground wire Use the following cable pinouts to make a cable to connect the ISIS using RS 485 half duplex Table 1 4 Pinouts for RS 485 ports on an ISIS RS 485 option model ...

Страница 14: ... of the battery requires removal of the Central Processor Card and re entry of the setup information 1 17 Replacement Parts Servicing the ISIS may call for replacement parts There are three categories of parts Non replaceable Standard Replacement Field Replacement 1 18 Non Replaceable Parts Other than the parts listed in the replacement parts section there are no serviceable components on an ISIS ...

Страница 15: ...ense This product generates and uses energy of about the same frequency as radio and TV broadcasts Installed cor rectly it may interfere with reception of radio and TV broadcasts If you suspect this product is causing interference turn your computer on and off while the radio or TV is showing interference If the interference disappears when you turn the computer off and reappears when you turn the...

Страница 16: ...e maximum end to end distance from the con troller to the hub is 328 feet 100m 7 Plug one end of another Ethernet cable into the RJ 45 Ethernet port on the Einstein that has the PC 104 network card installed 8 Plug the other end of the Ethernet cable into an empty port on a LAN hub or switch 9 All additional Einstein units should be con nected to the networked Einstein via the Ech elon network For...

Страница 17: ...er to the ISIS follow these steps 1 Take the supplied CPC approved network ca ble and plug the 9 pin connector into RS 232 COM 1 2 Plug the 4 pin connector into the COM C port on the REFLECS For more information see the CPC Refrigeration Monitor and Case Control Installation and Operation Manual Figure 1 7 ISIS to REFLECS NOTE The Ethernet connection must be made prior to applying power to the con...

Страница 18: ......

Отзывы: