background image

 

CC7.8.15/1019/E 

Ident number 3272062 

– P/N 052-3306-00/Rev00 

2/2

 

When entering the programming level for the first time the display will show the 

rtC

 (real time clock) label. 

 

Press 

 to access parameters N01/02/03/04/05 to adjust time & date. For further details see the condensing 

unit application guidelines, chapter 2.11 "Parameters level 1 

– Required settings". 

 

Press 

 or 

 to change from the 

rtC

 label to the 

Par

 label, in order to access the programming level 1. 

 

Press 

: the parameters of programming level 1 can be changed.

 

The following "Pr1" parameters must be verified before commissioning: 

Parameter 

Description 

Unit 

Factory 

settings 

Comments 

C07 

Refrigerant selection for 
regulation 

[-] 

R449A 

R22, R407A, R407F, R507, 

R448A, R449A, R134a, 

R407C 

C16 

Digital compressor setpoint 

[bar*] 

2.8 

0.3 for OLTE/OLE units 

C17 

Proportional band for 
compressor regulation 

[bar*] 

2.0 

1.0 for OLTE/OLE units 

C21 

Cycle time for digital 
compressor 

[sec] 

10 

 

C24 

Minimum capacity for digital 
compressor 

[%] 

10 

 

C25 

Maximum capacity for digital 
compressor 

[%] 

100 

 

D29 

Low-pressure alarm value 

[bar*] 

0.8 

0.3 for OLTE/OLE units 

E39 

Condenser setpoint 

[°C] 

35.0 

 

E46 

Regulation band of variable fan 

[°C] 

20.0 

 

N01 

Current minute 

[-] 

[-] 

 

N02 

Current hour 

[-] 

[-] 

 

N03 

Day of the month 

[-] 

[-] 

 

N04 

Month 

[-] 

[-] 

 

N05 

Year 

[-] 

[-] 

 

T18 

Access to Pr2 level 

[-] 

[-] 

Password: 3 2 1 

 

* Pressures are always relative 

Adjustable discharge pressure limitation:

 The controller  has dedicated parameters to provide the possibility of 

adjustable discharge pressure cut-out. 

Parameter  Description 

Factory 

settings 

Recommended 

settings 

E58 

Condenser temperature / Pressure threshold for high 
alarm 

27 

Required value 

E61 

Condenser temperature / Pressure threshold for 
alarm recovery 

23 

Required value 

 

 

NOTE: Error L21 can happen during first commissioning. This lockout indicates a wrong phase sequence. 
In this case two phases at the power supply terminals must be changed. 

NOTE:  This guide  is for  quick  installation  purposes.  For  detailed  instructions, please  refer  to  Application 
Guidelines C6.1.9 "

Copeland EazyCool™ Large Outdoor Condensing Units". 

Отзывы: