![Emerson ControlWave Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/emerson/controlwave/controlwave_instruction-manual_102109041.webp)
ControlWave Instruction Manual (CI-ControlWave)
Table 2-8. COM3 (on SCB) RS-232 Port Connector Pin Assignment
Pin
RS-232
Signal
RS-232 Description
1
DCD
Data Carrier Detect Input
2
DSR
Data Set Ready Input
3
RXD
Receive Data input
4
RTS
Request to Send Output
5
TXD
Transmit Data Output
6
CTS
Clear to Send Input
7
DTR
Data Terminal Ready Output
8 GND
Signal/Power
Ground
Use the “null modem” cable for full-duplex (PPP protocol)
communications when connecting a ControlWave to a PC. (See top part
of
.)
Half-duplex
Cable
(for CW)
Full-duplex
(Null Modem)
Cable
(PPP Protocol)
P/N 392843-01-3
CW
9-Pin Female
“D” Connector
P2
CW or PC
9-Pin Female
“D” Connector
P1
3 = TXD
6 = DSR
7 = RTS
8 = CTS
4 = DTR
2 = RXD
1 = DCD
5 = GND
3 = TXD
6 = DSR
7 = RTS
8 = CTS
4 = DTR
2 = RXD
1 = DCD
5 = GND
To P2 Pin-4
To P2 Pin-2
To P2 Pin-7
To P2 Pin-3
To P2 Pin-6
To P2 Pin-5
To P2 Pin-1
or
vice
versa
3 = TXD
6 = DSR
7 = RTS
8 = CTS
4 = DTR
2 = RXD
1 = DCD
5 = GND
3 = TXD
6 = DSR
7 = RTS
8 = CTS
4 = DTR
2 = RXD
1 = DCD
5 = GND
To P2 Pin-2
To P2 Pin-3
To P2 Pin-5
or
vice
versa
CW
9-Pin Female
“D” Connector
P2
CW
9-Pin Female
“D” Connector
P1
Figure 2-12. Full-duplex and Half-duplex Cable
Use the half-duplex cable (shown in the bottom part of
)
when connecting the ControlWave to another ControlWave series unit
(again, with the exception of the CW_10/30/35 units).
When communicating with a Network 3000 series RTU 3305, RTU
3310, DPC 3330, or DPC 3335 or CW_10/30/35, you must use one of
the cables shown in
Revised Nov-2010
Installation
2-25
Содержание ControlWave
Страница 4: ...This page is intentionally left blank ...
Страница 48: ...This page is intentionally left blank ...
Страница 136: ...This page is intentionally left blank ...
Страница 148: ...This page is intentionally left blank ...