The following is the recommended sequence for the installation and start-up
procedures. The sequence may change according to job and site conditions.
•
Obtain the recommended tools and test equipment.
•
Read the "Precautions" section carefully.
•
Check that all the equipment and materials have been delivered.
•
Proceed with the physical installation of the power system frame(s).
•
Install and connect the safety and reference ground cables.
•
Install and connect the AC input cabling for the rectifier.
•
Install and connect the DC cabling between the AP6C75AA Helios Candeo
and the batteries.
•
Connect the loads to the Distribution Module(s) as required.
•
Install and connect the wiring for the optional equipment as required.
•
Install and connect the external alarm and monitoring wiring as required.
•
Insert the rectifiers in the rectifier frame(s).
•
Start-up, verify and adjust the complete system.
2.2. Tools and test equipment
The following tools and test equipment are required:
•
dolly truck
•
safety goggles
•
screwdriver, flat blade, 10 mm (3/8 in.)
•
screwdriver, flat blade, 2 mm (3/32 in.)
•
cable strippers/electrician’s knife
•
wire stripper
•
linesman pliers
•
hacksaw
•
cable cutters (up to 750 kcmil)
•
crimper and die set (up to T&B 15 ton head)
•
open end and box end wrench sets
•
socket set (12.5 mm [1/2 in.] drive)
Содержание ASTEC Helios Candeo AP6C75AA
Страница 2: ......
Страница 4: ......
Страница 12: ...12 Contents IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 72: ...72 Cabling and connecting IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 84: ...84 Appendix A Drawings IM6C75AA P0914426 Standard 3 00 March 2001 This page is left blank intentionally ...
Страница 95: ......