Check in Numerical Sequence 

Problem 

1 Operation 

2 Generator 3 

Voltage 

For 3ATS & 3ADTS the engine-
generator set does not start when 
the transfer test button is pressed 
or when the Normal source fails. 

The outage must be long 
enough to allow for the 
feature 1C time delay plus 
engine cranking and starting 
time. 

Starting control must be 
in automatic position.  
Batteries must be 
charged and connected.  
Check wiring to the 
engine starting contacts. 

For 3ATS & 3ADTS the transfer 
switch does not transfer the load 
to the emergency source after the 
gen-set starts. 

Wait for the feature 2B time 
delay. For immediate 
transfer, press the transfer 
button (bypass timer).  If 
inphase transfer is active, 
wait for inphase condition. 
For 3NTS & 3NDTS press 
the transfer button. 

Is the generator 
accepted light on?  
Generator output circuit 
breaker must be closed.  
Generator frequency 
must be correct. 

Voltmeter should read at 
least 90% of nominal phase 
to phase voltage between 
transfer switch terminals EA 
and EC (or EL1 and EL2 for 
2 pole switches). * 
* There are factory settings.  

For 3ATS & 3ADTS the transfer 
switch does not transfer the load 
to normal source when normal 
returns or after transfer test. 

Wait for the feature 3A time 
delay. For immediate 
retransfer, press the transfer 
button (bypass timer).  If 
inphase transfer is active, 
wait for inphase condition. 
For 3NTS & 3NDTS press 
the transfer button. 

Voltmeter should read at 
least 90% of nominal phase 
to phase voltage between 
transfer switch terminals NB 
and NC, NC and NA, and 
NA and NB (or NL1 and NL2 
for 2 pole switches).  

For 3ATS & 3ADTS  the 

generator does not stop after load 

retransfer to the normal source. 

Wait for the feature 2E 
delay. 

Starting control must be 
in automatic position. 

For 3ADTS & 3ADTS the load is 
deenergized (off). 

 Load 

Disconnect Timer

 on display. 

Wait for the delayed-
transition transfer timer. See 
User’s Guide 381333-400. 

 - 

 

Not in auto light is always on. 

For 3NTS & 3NDTS this 
light is always on, indicating 
it is a manual transfer 
switch. 

- - 

 

Alert light is on. 

Read the display for more 
information.  Refer to  
User’s Guide 381333-400. 

- - 

 

 

 

 

Содержание ASCO 3ATS

Страница 1: ...d the foundation must be prepared so that the conduit stubs are located correctly Refer to the enclosure outline drawing for specified area and location Provide cable bending space and 1 inch minimum clearance to live metal parts When a concrete floor is poured use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment Mounting Refer to the outline and mo...

Страница 2: ...are solderless screw type and will accept the wire sizes listed on the drawings provided with the transfer switch Be careful when stripping insulation from the cables avoid nicking or ringing the conductor Remove surface oxides from cables by cleaning with a wire brush When aluminum cable is used apply joint compound to conductors Tighten cable lugs to the torque specified on rating label Harnesse...

Страница 3: ...aintenance handle is provided on the transfer switch for maintenance purposes only Manual operation of the transfer switch should be checked before it is energized operated electrically Do not manually operate the transfer switch until both power sources are disconnected open both circuit breakers 1 After deenergizing both power sources open the enclosure door Locate and remove the maintenance han...

Страница 4: ...ttings in the controller Close the normal source circuit breaker The normal source accepted and the load on normal lights should come on 1 2 Use an accurate voltmeter to check phase to phase and phase to neutral voltages present at the transfer switch normal source terminals Close the emergency source circuit breaker Start generator if necessary The emergency source accepted light should come on 3...

Страница 5: ...ransfer button The engine should start and run within 15 seconds For 3NTS 3NDTS the generator must be started manually at the generator The emergency source accepted light should come on 2 For 3ATS 3ADTS the transfer switch should transfer to the emergency position The load on emergency light should come on and the load on normal light should go off For 3NTS 3NDTS press the transfer button for loa...

Страница 6: ...s required Renew factory lubrication if the transfer switch is subjected to severe dust abnormal operating conditions or if the TS coil is replaced Order lubrication kit 75 100 Check all cable connections retighten them Torque to values shown on the transfer switch label Replacement Parts When ordering replacement parts provide the Serial No Bill of Material No BOM and Catalog No from the transfer...

Страница 7: ...meter should read at least 90 of nominal phase to phase voltage between transfer switch terminals EA and EC or EL1 and EL2 for 2 pole switches There are factory settings For 3ATS 3ADTS the transfer switch does not transfer the load to normal source when normal returns or after transfer test Wait for the feature 3A time delay For immediate retransfer press the transfer button bypass timer If inphas...

Страница 8: ...tion 6 installation 2 insulator backing piece 2 WARNING 2 L lights 4 5 7 line connections 2 load on emergency light 4 5 load on normal light 4 5 lubrication 6 M maintenance 6 maintenance handle 3 6 WARNING 3 6 manual load transfer 6 WARNING 3 6 manual operation 3 WARNING 3 6 manual transfer 3NTS 5 membrane controls 4 5 mounting 2 N non automatic 3NTS 5 7 normal source accepted light 4 5 not in aut...

Отзывы: