2
Physical installation
2.1
Pipe mounting
Procedure
1. Insert larger U-bolt around 2-in. pipe/mast, through the saddle,
through the L-shaped bracket, and through the washer plate.
2. Use a 1/2-in. socket-head wrench to fasten the nuts to the U-bolt.
3. Insert smaller U-bolt around base the Field Link and through the L-
shaped bracket.
4. Use a 1/2-in. socket-head wrench to fasten the nuts to the U-bolt.
Figure 2-1: Mounting
2.2
Power and data wiring
Procedure
1. Remove housing cover labeled “Field Terminals.”
2. Connect the positive power lead to the “+” power terminal and the
negative power lead to the “–” terminal.
3. Connect the Data + lead to the “A (+)” terminal and the Data – lead
to the “B (–)” terminal.
4. Plug and seal any unused conduit connections.
5. Replace the housing cover.
Quick Start Guide
September 2020
6
Emerson.com/Rosemount
Содержание 781
Страница 1: ...Quick Start Guide 00825 0100 4421 Rev DC September 2020 Emerson Wireless Field Link ...
Страница 19: ...Figure 6 1 Rosemount 781 Declaration of Conformity September 2020 Quick Start Guide Quick Start Guide 19 ...
Страница 20: ...Quick Start Guide September 2020 20 Emerson com Rosemount ...
Страница 21: ...September 2020 Quick Start Guide Quick Start Guide 21 ...
Страница 23: ...September 2020 Quick Start Guide Quick Start Guide 23 ...