
Emcore Corporation
MAN-10901G Rev B
10901G Operating Manual
Power Supply
9
Chapter 2 INSTALLATION AND SETUP PROCEDURES
Introduction
This section contains information and procedures for installing the Model 10901G Power Supply, and for preparing it for
operation.
Unpacking and Inspecting the System
Unpack the system carefully; thoroughly inspecting the equipment to assure that no damage has occurred in shipment. If
damage is found, notify the responsible carrier and Emcore Corporation immediately.
Carefully check the contents of the shipment against the shipping list. Notify Emcore Corporation if there is an apparent
discrepancy.
Installing System Assemblies
Install each assembly in a standard NEMA 19-inch rack, with the10901G Power Supplies in the last two slots, (see fig 2-1).
Use an approved AC power cord UL listed (supplied with unit) to an AC outlet. Unit will accept both 110 and 230 VAC. Turn
switch on and verify LED’s to be ON.
This completes setup and installation procedures. The system is now ready for normal operation.
10901G
10901G