background image

ASSEMBLY

TOOLS NEEDED

 

1.  13/64” drill bit 

5.  Screwdriver                              9. Marker   

 

2.  Hand drill 

6.  Fine half round file                  10. Hammer

 

3.  Tape measure 

7.  Heavy duty pop rivet gun         11. Hose Clamp

 

4.  Fine tooth hacksaw 

8.  Masking tape 

Step 19:  

Position the completed 

assembly vertically over the riser 
pipe with the square cut down. 

 

Carefully lower the completed drop 
tube/valve assembly into the riser 
pipe until the collar rests on the 
riser pipe.

WARNING:

  Do not use electrical devices near gasoline vapors, as it could result in fire or 

explosion.

AVERTISSEMENT:

 Ne pas utiliser d’appareils électriques à proximité des vapeurs d’es-

sence, car il pourrait provoquer un incendie ou une explosion.

2

INSTALLATION OF COMPLETED ASSEMBLY INTO THE TANK

Step 20:

  Use the hose clamp 

to clamp the warning plate (p/n 
564420, supplied), onto the riser 
pipe below the threads.  Make sure 
label is facing up.

Optional

:  45 degree cut - The 

shortest point should start at length 
E to maintain the 6” maximum clear-
ance requirement at bottom of tank.

Step 17:

  Square cut the lower tube 

to length E. 

7

E

(1) Warning plate #564420
(6) Pop rivets #564394
(1) Hose clamp #564421 
(1) Seal-All #566726 
(1) O-ring #565023

 

(1) Collar #565006 
(1) Gasket #565023
(1) Disc seal #566539
(1) Wave spring #564441
(1) Thrust washer #566038

 

493768 Assembly Kit - 06_S

 

(1) Collar #565004

 

(6) Pop rivets #564394

 

(1) Seal-All #566726

 

(1) Warning plate #564420

493785 Assembly Kit - 08_S, Self-Sealing

 

 

Upper Lower Overall 

Max. 

 

Nominal

  

Tube Tube 

Tube 

Burial 

Tank 

 Model 

No. 

Length  Length  Length  Depth  Dia.

 

 

 

 

A1100-065S Non 

Self-Sealing 

  65”  82”  162” 5.6’  8’

A1100-066S Non 

Self-Sealing  65”  94”  174” 5.5’ 10’

A1100-067S Non 

Self-Sealing  65”  120”  200” 5.3’ 12’

A1100-085S    Self-Sealing 

 

65”  82”  162” 5.4’  8’

A1100-086S Self-Sealing 

 

65”  94”  174” 5.3’ 10’

A1100-087S    Self-Sealing 

65” 120” 200” 5.1’ 12’

Note:  

Emco recommends installing the Emco A0032-001 Adapter Clamp to pre-

vent the adapter from loosening in use.

PACKING LIST

TOP TUBE INSTALLATION PROCEDURE

The A1100 Guardian can only be installed 

after 

the containment manhole has 

been installed.

Step 1:

  If already in place, remove the existing 4” cap, adapter and drop tube 

assembly.

Step 2:

  Find measurement A which is the distance from the inside top of the tank 

to the top of the 4” riser pipe as shown in Figure 1.  If the tank has a manway, 
make sure to include the height of the manway when finding Dimension A as 
shown in Figure 2.  

Step 18:

  Turn the completed assembly upside down and shake vertically to 

remove any metal chips left from the drilling process. 

Содержание A1100 Series

Страница 1: ...he adapt er and riser pipe threads Position the adapter on the riser and begin to turn the adapter to engage the riser pipe threads Once the threads engage turn the A0089 001 adapter approximately 4 t...

Страница 2: ...O ring 565023 1 Collar 565006 1 Gasket 565023 1 Disc seal 566539 1 Wave spring 564441 1 Thrust washer 566038 493768 Assembly Kit 06_S 1 Collar 565004 6 Pop rivets 564394 1 Seal All 566726 1 Warning pl...

Страница 3: ...extends above the riser in self sealing applications Mark tube to length E These dimensions will position the tube 6 from the tank bottom Step 13 Apply a liberal coat of pipe dope to male threads of t...

Страница 4: ...ect orientation of the drop tube and the collar Drill the remaining 5 holes Fasten the collar using the rivets p n 564394 Apply Seal All liberally over the rivets before they are installed to prevent...

Страница 5: ...ect orientation of the drop tube and the collar Drill the remaining 5 holes Fasten the collar using the rivets p n 564394 Apply Seal All liberally over the rivets before they are installed to prevent...

Страница 6: ...extends above the riser in self sealing applications Mark tube to length E These dimensions will position the tube 6 from the tank bottom Step 13 Apply a liberal coat of pipe dope to male threads of t...

Страница 7: ...O ring 565023 1 Collar 565006 1 Gasket 565023 1 Disc seal 566539 1 Wave spring 564441 1 Thrust washer 566038 493768 Assembly Kit 06_S 1 Collar 565004 6 Pop rivets 564394 1 Seal All 566726 1 Warning pl...

Страница 8: ...he adapt er and riser pipe threads Position the adapter on the riser and begin to turn the adapter to engage the riser pipe threads Once the threads engage turn the A0089 001 adapter approximately 4 t...

Отзывы: