11. Return the faulted I/O module.

Note

The I/O modules in your DPE may differ from those shown in the illustrations in this
document.

Preparing the storage processor (SP) for service

To protect your VNXe system from accidental data loss during this maintenance activity,
you must prepare the SP for service. You prepare an SP for service by putting it in Service
mode.

NOTICE

Both SPs must NOT be in Service mode at the same time.

Procedure

1. Open Unisphere

 and select 

Settings

, then 

Service System

.

2. Log in with your service password.
3. In the 

System Components

 column, select the storage processor with the part you are

replacing (SP A or SP B).

4. Under 

Service Actions

, select 

Enter Service Mode

, then 

Execute service action

.

5. In the 

Service Confirmation

 dialog box click 

OK

.

Putting an SP into Service mode takes about 10 minutes to complete.

6. Wait until the SP fault LED is flashing alternating amber and blue before continuing to

the next task.

The storage processor fault LED will flash alternating amber and blue while the SP
remains in Service mode and is receiving active power (

Figure 1 on page 6

).

Figure 1  SP fault LED

046-

004-

901_03

HDMI

Removing an SP assembly

Before you begin

Locate the faulted SP assembly with the flashing alternating amber and blue Fault LED.

Figure 2  Location of SP assembly fault LED

046-

004-

901_03

HDMI

6

EMC VNXe

  

Содержание VNXe

Страница 1: ...n access to CPU board components You access an I O module from the rear of the enclosure NOTICE Always replace an I O module with one that is the exact same type Verify the type by reading the label o...

Страница 2: ...that has accumulated on your body discharges through the circuits If the air in the work area is very dry running a humidifier in the work area will help decrease the risk of ESD damage Follow the pr...

Страница 3: ...you must move around the room or touch other surfaces before installing a unit first place the unit back in the antistatic bag When you are ready again to install the unit repeat these procedures Har...

Страница 4: ...when removing handling or storing replaceable units CAUTION Some replaceable units have the majority of their weight in the rear of the component Ensure that the back end of the replaceable unit is s...

Страница 5: ...r filler panel to ensure proper air flow throughout the system Unpacking a part Procedure 1 Wear ESD gloves or attach an ESD wristband to your wrist and the enclosure in which you are installing the p...

Страница 6: ...the storage processor with the part you are replacing SP A or SP B 4 Under Service Actions select Enter Service Mode then Execute service action 5 In the Service Confirmation dialog box click OK Putt...

Страница 7: ...dropping it 2 Squeeze the orange levers on the latches on the sides of the SP assembly to release the latches and then pull the latches outward 3 Pull out the latches until they are fully extended and...

Страница 8: ...back 1 4 inch 3 Lift the cover up Figure 4 Removing the SP top cover CL5233 1 3 2 Removing the I O module Refer to Figure 5 on page 9 while performing the procedure that follows Procedure 1 Lift the b...

Страница 9: ...lignment pins NOTICE Do not attempt to seat the module into the CPU connector while you are holding the module at an angle Doing so will damage the connections The module should be flat before you att...

Страница 10: ...tab secures the cover Figure 7 Replacing the SP top cover CL5234 3 1 2 Installing an SP assembly Refer to Figure 8 on page 11 while performing the procedure that follows Procedure 1 Pull out the latc...

Страница 11: ...t Settings then Service System 2 Log in with your service password 3 In the System Components column select the storage processor currently in Service mode SP A or SP B 4 Under Service Actions select...

Страница 12: ...aterial within 5 10 business days All instructions and material required to return your defective part were supplied with your good part shipment Procedure 1 Package the faulted part in the shipping b...

Страница 13: ...ically disclaims implied warranties of merchantability or fitness for a particular purpose Use copying and distribution of any EMC software described in this publication requires an applicable softwar...

Отзывы: