![EMC Connectrix EC-1100 System Скачать руководство пользователя страница 192](http://html1.mh-extra.com/html/emc/connectrix-ec-1100-system/connectrix-ec-1100-system_user-manual_2399715192.webp)
F
F-2
Connectrix EC-1100 System User Guide
Power-on and Power-off Procedures
Power On Procedure
The EC-1100 has two AC power inputs, one for each power source.
As shown in Figure F-1, the EC-1100 has a separate switch for each
power source.
Prior to connecting the power inputs to facility outlets, ensure that power is
switched OFF.
Figure F-1
EC-1100 and ED-1032 Power Switches
ED-1032
Power Switch
OFF = Left
ON = Right
EC-1100
Power Switches (2)
OFF = Right
ON = Left
EC-1100, Front
EC-1100, Rear
CTP
GPM
GPM
GPM
CMM
GPM
CMM
CTP
MPC
MPC
GPM
ENET
ENET
GPM
GPM
GPM
CTP
GPM
GPM
GPM
GPM
CMM
CTP
MPC
MPC
GPM
ENET
ENET
GPM
GPM
GPM
ED-1032
Power Switch
OFF = Left
ON = Right
Содержание Connectrix EC-1100 System
Страница 4: ...Connectrix EC 1100 System User Guide iv...
Страница 8: ...Connectrix EC 1100 System User Guide viii Contents...
Страница 12: ...xii Connectrix EC 1100 System User Guide Figures...
Страница 14: ...xiv Connectrix EC 1100 System User Guide Tables...
Страница 22: ...xxii Connectrix EC 1100 System User Guide Warnings and Cautions...
Страница 78: ...2 2 46 Connectrix EC 1100 System User Guide Connectrix Manager Administration...
Страница 83: ...3 Fabric Manager Views 3 5 Fabric Manager Figure 3 3 Zoning View Showing Active Zone Set...
Страница 92: ...3 3 14 Connectrix EC 1100 System User Guide Fabric Manager...
Страница 128: ...4 4 36 Connectrix EC 1100 System User Guide Fabric Zoning...
Страница 140: ...5 5 12 Connectrix EC 1100 System User Guide Connectrix Manager Logs...
Страница 196: ...F F 6 Connectrix EC 1100 System User Guide Power on and Power off Procedures...
Страница 212: ...s 4 Connectrix EC 1100 System User Guide Sales and Service Locations...