EMC Celerra NX4 Скачать руководство пользователя страница 18

18

For more information, refer to Celerra Tools on http://Powerlink.EMC.com

Powering EMC

 

Celerra

 

NX4 system

 

 

Power Up procedure for the dual SPS system

Note:

 

Verify that the cabinet circuit breakers are in the ON position. If you are installing the NX4 into an 

existing cabinet that contains other components, do not turn off the cabinet circuit breakers. Ensure that 
the switches for SPS A and SPS B are turned OFF.

Connect the power cables as follows:

        

A yellow circle with a number indicates the power cable number.

 
1. Connect the power cables to the DAEs

        

through

       .

2. Connect the power supply A on the DPE to SPS A.

3. Connect the power supply B on the DPE to SPS B

.

4. Connect SPS A power cable to the right PDP

5. Connect SPS B power cable to the left PDP.

 

6. Turn on SPS A and SPS B.
    Wait for the storage array to power up. It can take 8 to 10 minutes to power up. The blinking orange    
    fault LED on the SPS will extinguish and the solid green power LED will turn on when the SPS is  

 

    powered up. The blinking green LED on each SP will become solid green LEDs when the SPs  

 

    have booted.

7. Connect the blade enclosure to the right and left PDP.

  

  The power LED on the blade enclosure will be lit when the blades have powered up.

    
8. Connect the Control Station (CS) to the left PDP.

  

  If the system power LED does not light up, take the bezel off of the front of the CS and press the        

    power button.

10

9

1

8

15

11

12

13

14

#

Содержание Celerra NX4

Страница 1: ...EMC Celerra NX4 System Dual Blade Installation Guide P N 300 010 728 Rev A01 Version 6 0...

Страница 2: ...n of any EMC software described in this publication requires an applicable software license For the most up to date regulatory document for your product line go to the Technical Documentation and Advi...

Страница 3: ...100 Netmask 255 255 255 0 IP address of storage processor A 128 221 252 200 IP address of storage processor B 128 221 253 201 Gateway IP address of storage processor A 128 221 252 104 Gateway IP addre...

Страница 4: ...s lic e n s e d to E M C C o rp o ra ti o n fr o m th ir d p a rt ie s U s e o f th is C D a n d th e in te lle c tu a l p ro p e rt y c o n ta in e d h e re in is e x p re s s ly lim it e d to th e t...

Страница 5: ...s document Ensure that all of your cables are seated securely About 45 minutes 3 When you install your Celerra NX4 use the Celerra Startup Assistant CSA to configure your system The CSA is on the Cele...

Страница 6: ...ased and shipped in an EMC 40 unit cabinet of 70 in where 1 unit 1 75 in start on page 12 of this document and confirm that the cables are installed correctly and securely Otherwise start unpacking yo...

Страница 7: ...t Disk processor enclosure DPE Standby power supply SPS Control Station CS Blade enclosure Accessory box CNS 001427 Shrink wrapped Installation Guide environmental information and notices TLA Serial N...

Страница 8: ...processor enclosure DPE Blade enclosure Do not remove the mini rack from shipping container CNS 001429 2 3 4 1 Remove this label and paste it on the back of the front cover of this installation guide...

Страница 9: ...crews on each side of the rack to hold the rail in place Ganged rail slide 1 Remove the larger headed screws holding the ganged rails in place Keep the screws to install the ganged rails in your rack...

Страница 10: ...dby power supply SPS 1U latch each and 1 screw each each side Right front side Press Snap on bezels Press to install the bezel then release The indentation goes toward the inside of the rack Install t...

Страница 11: ...lade types shown Both blades in the enclosure must be the same type as in the illustration 4 port copper Ethernet FRU label 10 100 2 3 FRU label 10 100 2 3 Blade 2 Blade 3 046 003 710_A01 FRU label 10...

Страница 12: ...de enclosure SP A Disk processor enclosure DPE 0 Fibre 3 AUX 2 AUX 1 Fibre BE1 Blade 2 Blade 2 BE0 BE1 Blade 3 Blade 3 BE0 SP A 2 AUX SP B 2 AUX SP A 3 AUX SP B 3 AUX 1 3 4 2 BE0 Blade 2 BE1 Blade 3 S...

Страница 13: ...NX4 standby power supply SPS and MODEM ports S P S A S P A Control Station CS Standby power supply SPS Blade enclosure CNS 001416 Disk processor enclosure DPE Modem SPS A SP A MODEM plug SPS B SP B SP...

Страница 14: ...ts SPS B CS A Blade 2 Blade 2 SP A SP B Blade 3 CS B Blade 3 1 2 4 3 Disk processor enclosure DPE Control Station CS Standby power supply SPS Blade enclosure SPS A SP B Blade 2 SP A S P B CS A Blade 2...

Страница 15: ...Standby power supply SPS Blade enclosure Disk processor enclosure DPE To public LAN To public LAN To public LAN Blade 3 SP B Blade 2 SP A SPS B SPS A MGMT cge 0 cge 1 cge 3 cge 2 cge 0 cge 1 cge 3 cge...

Страница 16: ...console MODEM VGA A SPS B optional SPS A CS 1 AUX 0 AUX BE 1 BE 0 1 AUX 0 AUX BE 1 BE 0 cge0 cge1 cge2 cge3 cge0 cge1 cge2 cge3 Disk processor enclosure Control Station Standby power supply Pull rele...

Страница 17: ...17 For more information refer to Celerra Tools on http Powerlink EMC com EMC Celerra NX4 system notes...

Страница 18: ...PE to SPS A 3 Connect the power supply B on the DPE to SPS B 4 Connect SPS A power cable to the right PDP 5 Connect SPS B power cable to the left PDP 6 Turn on SPS A and SPS B Wait for the storage arr...

Страница 19: ...A SPS A power switch Power distribution panel PDP Disk processor Optional disk array enclosure DAE Optional DAE Optional DAE Optional DAE PDP 1 2 3 4 5 6 7 8 9 14 13 SPS B power switch 11 10 12 15 Dis...

Страница 20: ...power supply A on the DPE to SPS A 3 Connect power supply B on the DPE to the left PDP 4 Connect SPS A power cable to the right PDP 5 Turn on SPS A Wait for the storage array to power up It can take...

Страница 21: ...copper or two port 10 GbE optical and two port copper Power Up cabling procedure for single SPS system CNS 001435 Blade 2 SP B SP A Control Station Blade enclosure SPS A SPS B SPS A power switch Power...

Страница 22: ...X 0 Fibre 1 Fibre 2 AUX 3 AUX 0 Fibre 1 Fibre 2 3 FRU label 10 100 2 3 SP B 3 AUX Blade 3 BE 1 Blade 3 Blade 2 BE 1 SP A 3 AUX SP B 2 AUX CS A Blade 2 BE 0 SP B Blade 3 SP A 2 AUX Blade 3 Blade 3 BE 0...

Страница 23: ...de 3 BE 1 SP B 2 AUX CS A SP B Blade 3 Blade 3 CS B MGMT A CS MGMT B SP A SP A SP A 3 AUX SP A 2 AUX 2 AUX 3 AUX 0 Fibre 1 Fibre 2 AUX 3 AUX 0 Fibre 1 Fibre 0 fxg 0 fxg 1 SPS B SP B Blade 3 BE 0 Blade...

Страница 24: ...rking Control Station Standby power supply Blinks green when booting FRU label 10 100 2 3 Blade 2 Blue when cabled Blinks amber when booting Off when working Green when booted Blade enclosure Link Act...

Страница 25: ...latest version of the CSA from the Celerra Tools section of Powerlink Getting Started with the Celerra Startup Assistant can be downloaded from Powerlink and provides more information on the CSA pre...

Страница 26: ...ne array maintenance and upgrades In addition for Celerra systems where Navisphere licenses are in place Navisphere can be used to manage storage for external host connectivity and the Celerra However...

Страница 27: ...t CSA If you want to provision storage using the CSA complete this section Storage provisioning involves creating RAID groups and LUNs Blade name IP Address to be assigned to the newly created interfa...

Страница 28: ...ksheet continued Blade name Export name Allocate storage from select from dropdown Export size MB GB or TB Host access read only export Read only hosts Read Write hosts Root hosts Access hosts Create...

Страница 29: ...f remote host is selected Blade name iSCSI target IP address iSCSI target name Allocate storage from select from dropdown iSCSI LUN number iSCSI LUN size MB GB or TB Number of expected Snaps Number of...

Страница 30: ...server domain Windows NT4 Windows 2000 and Windows 2003 DNS server IPs Windows 2000 and Windows 2003 Domain admin user name Windows 2000 and Windows 2003 Domain admin password Windows 2000 and Windows...

Страница 31: ...e installing the CSA verify the following requirements Access to the Powerlink website preferred or the Celerra Network Server Applications and Tools CD is available Windows based client computer is o...

Страница 32: ...ns your system will be ready for production Common implementations include Create CIFS shares Create iSCSI LUNs Create NFS exports Add additional hosts for Fibre Channel enabled systems Preform Common...

Страница 33: ......

Страница 34: ......

Отзывы: