www.sureheat.com
200084-01A
12
INSTALLATION
Figure 11 - Hood Installation
Remove 2
Screws from Top
Firebox Panel
Insulation
Board
Replace 2
Screws
Hood
Step 1
Step 2
Step 3
CAUTION: Do not operate
fireplace without hood in place.
1. Fireplace hood is positioned on top of
shipping inner pack.
2. Remove top of firebox by removing 2 screws
located on each end (see Figure 11).
3. Insert the hood along the upper side of
the heat insulation board (see Figure 11).
Attach hood with 3 screws.
4. Reattach firebox top by reinserting the 2
screws from step 2.
ASSEMBLING HOOD
MANTEL
Assemble and install your mantel at this time. See page 28 for mantel in-
structions. Mantel must be in place before you connect to the gas supply.