For a correct installation, follow the recommendations 
listed below:

3. Installation guide

Follow the arrangement shown in 

2.Facility

scheme

Once you have located the dispenser, make

sure that the length of the hoses allows to reach

the facility pipes.

Drill a 10mm hole in the filter outlet pipe. Remove

burrs and debris.

Next, present the gasket and place the saddle

clamp with the adaptor, as shown in the

following figure:

Go to Index

Tighten the whole assembly and make sure you

have connected the flexible hose to the saddle

fitting adaptor.

Repeat the same procedure for the outlet pipe, as

indicated in 

2.Facility scheme

Once the two connections are fixed to the pipes,
connect the free ends of the hoses to the inlet 

(E)

and outlet 

(F) 

of the dispenser.

Содержание CL-01A

Страница 1: ...Chemical feeder CL 01A User Quick Guide...

Страница 2: ...e you will find the main information about this equipment by taping onto each section Let us invite you to learn more about our entire range of products If you click on the Emaux logo below a URL link...

Страница 3: ...Index 1 Security warnings 2 Facility scheme 3 Installation guide 4 Operating instructions 5 Maintenance Go to Introduction...

Страница 4: ...Always use chlorine bromine or oxygen tablets and do not mix chemicals Never open the lid of the equipment when the system is running To open the feeder follow the instructions in section 5 Maintenan...

Страница 5: ...1 2 3 4 5 6 7 2 Facility scheme 1 Pump 2 Filter 3 Ozone injection 4 UV system 5 Chemical feeder 6 Check valve 7 Heat pump Go to Index Go to Installation guide...

Страница 6: ...filter outlet pipe Remove burrs and debris Next present the gasket and place the saddle clamp with the adaptor as shown in the following figure Go to Index Tighten the whole assembly and make sure yo...

Страница 7: ...ing Emaux UV Nanotech Ozone these levels can be reduced between 0 25 to1ppm To open and load the equipment follow the instructions in section 5 Maintenance Check that there are no leaks in the install...

Страница 8: ...ve C Isolate hydraulically water flow closed the chemical feeder in order to release pressure and empty the system Unthread the air bleeder A and carefully open the lid B trying not to breath nor to g...

Страница 9: ...H incorporated Change the gaskets H and insert the valve C in the dispenser again Turn the valve C clockwise until it can be completely closed Go to Index Winterization Follow the instructions as sho...

Страница 10: ......

Отзывы: