background image

Chemical feeder

CL-01A

User Quick Guide

Содержание CL-01A

Страница 1: ...Chemical feeder CL 01A User Quick Guide...

Страница 2: ...e you will find the main information about this equipment by taping onto each section Let us invite you to learn more about our entire range of products If you click on the Emaux logo below a URL link...

Страница 3: ...Index 1 Security warnings 2 Facility scheme 3 Installation guide 4 Operating instructions 5 Maintenance Go to Introduction...

Страница 4: ...Always use chlorine bromine or oxygen tablets and do not mix chemicals Never open the lid of the equipment when the system is running To open the feeder follow the instructions in section 5 Maintenan...

Страница 5: ...1 2 3 4 5 6 7 2 Facility scheme 1 Pump 2 Filter 3 Ozone injection 4 UV system 5 Chemical feeder 6 Check valve 7 Heat pump Go to Index Go to Installation guide...

Страница 6: ...filter outlet pipe Remove burrs and debris Next present the gasket and place the saddle clamp with the adaptor as shown in the following figure Go to Index Tighten the whole assembly and make sure yo...

Страница 7: ...ing Emaux UV Nanotech Ozone these levels can be reduced between 0 25 to1ppm To open and load the equipment follow the instructions in section 5 Maintenance Check that there are no leaks in the install...

Страница 8: ...ve C Isolate hydraulically water flow closed the chemical feeder in order to release pressure and empty the system Unthread the air bleeder A and carefully open the lid B trying not to breath nor to g...

Страница 9: ...H incorporated Change the gaskets H and insert the valve C in the dispenser again Turn the valve C clockwise until it can be completely closed Go to Index Winterization Follow the instructions as sho...

Страница 10: ......

Отзывы: