EM-Technik GmbH - Industriestraße 2 - 67133 Maxdorf - Germany
[email protected]
www.em-technik.com
4
2 Manufacturer’s Specifi cation
2.1 Description
• The fl exible tube is pushed onto the barb by hand and
the tube expands. If the connection is to be secured
against shear, torsional or longitudinal forces, the tube
must be fi xed to the barb, e.g. with a pipe clamp.
2.2 Transport and Storage
• The connector must be protected against mechanical
damage, moisture, dirt and dust. The storage tempera-
ture range is 10 – 40°C.
• Avoid UV radiation and direct sunlight.
• Leave the connector in its original packaging to ensure
the best possible protection.
• Dispose of the packaging material according to dispo-
sal requirements/environmental protection regulations.
3 Technical Data
3.1 Dimensions
The exact dimensions of the connector can be found on
our homepage under the following link:
www.em-technik.com
Special sizes can be asked via [email protected]
3.2 Operating Medium
• Gaseous and liquid media that do not negatively aff ect
the physical and chemical properties of the relevant
housing and sealing material.
• If you have questions about resistance please contact
em
technik.
• For the maximum permitted operating pressure/tempe-
rature see the pressure guide.
3.3 Pressure Guide
As the temperature rises, the eff ectiveness of the con-
nector falls, as shown by this table.
Material
PP
PVDF
Pressure Stage
PN 10
PN 10
-40°C
75%
-20°C
100%
5°C
100%
100%
20°C
100%
100%
30°C
80%
80%
40°C
70%
70%
50°C
60%
60%
60°C
50%
50%
70°C
40%
45%
80°C
30%
40%
90°C
20%
35%
100°C
35%
110°C
30%
120°C
25%
130°C
25%
140°C
10%
4 Assembly and Operation
4.1 Assembly Instructions
• Make certain the connector is suitable for the relevant
application. The connector must be suitable for the
operating conditions of the linesystem (medium, con-
centration, temperature and pressure) as well as the
relevant ambient conditions.
• Check the connector for transport damage before in-
stalling it. If the connector is damaged do not install it.
• The planner, the construction company or operating
company are responsible for the positioning and ins-
tallation of the connector. Planning and installation er-
rors can adversely aff ect the reliable functionality of the
connector and may represent a signifi cant potential for
hazard.
• After the connector is installed perform a tightness and
function check.