background image

 

10 

 

 

 
 

 

 

 

 

Legionella Cleaning Cycle   

 

 

 

 
 
A service technician can program a HOTRUN-VE model to run through a Legionella Cleaning 
Cycle. The purpose of the Legionella Cleaning Cycle is to provide a thermal disinfection of 
fixtures downstream of the HOTRUN water heater. A cycle will run for >10 minutes at a 
temperature of >60°C as per the current Australian Health Ministers' Regulations and directions 
given to ELWA in every State of Australia. ELWA can organise this service for all customers 
who have a HOTRUN-VE model installed with models produced from 2015 onwards. During the 
Legionella cleaning cycle the display shows the count-down time of the cycle (600 seconds) until 
completion, and then remembers all its previous settings for normal operation. 
 

 
 

 

 

 

 

Maintenance  

 

 

 

 

 
 

-

 

Due to its advanced design the HOTRUN does not require any maintenance. 

-

 

To clean cover, use damp cloth only. 

-

 

Scouring and dissolving agents are not suitable. 

-

 

Regularly remove debris or scale building up in shower heads and in tap-aerators.  

 
 

 

 

 

 

Troubleshooting 

 

 

 

 

 

Fault Code   

Most likely cause 

 

 

 

F1 

 

Temperature sensor not connected or faulty (reconnect or replace temperature sensor) 

 

 

 

F0 

 

Temperature sensor short circuit (replace temperature sensor) 

 

 

 

HH 

 

Too high inlet or outlet temperature >75°C ± 5°C 

 

 

 

LL 

 

Inlet water temperature too low < 3°C 

 

 

 

LF 

 

Inlet water flow too low (can come up for a few seconds during normal start-up) 

 

 

 

OT 

 

Over Temperature/Over Pressure safety switch tripped (reset button) 

 
 

Initial checks 
 

-

 

Adequate supply and pressure of the water (min. 60kPa).  

-

 

Make sure the cold water inlet and the hot water outlet are not connected in reverse. 

-

 

The main switch or circuit breaker is switched on. 

-

 

The fuse/circuit breaker is not blown / triggered. 

-

 

Flow rate from the tap needs to be higher than the minimal flow-rate of the model 
installed to activate the heating elements. 

Содержание HOTRUN-VE 38VE

Страница 1: ......

Страница 2: ...ical connection 6 Electrical schematics 7 Control panel 8 Legionella cleaning cycle 9 Maintenance 10 Troubleshooting 10 Terms of warranty 14 Flexible connections 15 Approvals IEC AS NZS 60335 2 35 Ele...

Страница 3: ...about the electrical resistance specific resistance of the water in your area The water heater should not be installed in an area exposed to the risk of freezing Do not operate a HOTRUN in a dry state...

Страница 4: ...ing of the water will stop automatically The capacity performance of the HOTRUN depends on its electrical capacity kWatt rating A temperature rise of 25 C to 30 C can be expected with the standard flo...

Страница 5: ...pressure as the cold water can be pushed back to the HOTRUN when mixing cold water to the hot water and cause the HOTRUN to switch off Sometimes a pressure limiter in the total cold water supply need...

Страница 6: ...l connections prior to fitting the unit to the wall To do so remove the inlet and outlet water connections and use the supplied blanking grommets to close of the two holes Allow for 2 elbows 1 2 BSP m...

Страница 7: ...7 Electrical schematics...

Страница 8: ...8...

Страница 9: ...d in The red indicator will flash while you set temperature the display show the required temperature flashing before reaching set temperature On initial start up the temperature setting will be the m...

Страница 10: ...require any maintenance To clean cover use damp cloth only Scouring and dissolving agents are not suitable Regularly remove debris or scale building up in shower heads and in tap aerators Troubleshoot...

Страница 11: ...11 3 phase models Heat exchanger of the 3 phase models 120VE 240VE...

Страница 12: ...3 Hot water outlet 4 Temperature controller 5 Over temperature safety switch optional 6 Transformer 7 Triac power control board 8 Capacitor PCB 9 Over pressure over temperature safety switch 10 Termi...

Страница 13: ...safety switch Seek electrical assistance to check power supply on all phases and continuity all the way to the electric elements and to measure element resistance The water that is coming out of the H...

Страница 14: ...e Before you contact the installer we advise you to read the directions for use You can avoid needless discomfort and possible costs You can also read our service manual online on www elwa com au If y...

Страница 15: ...15 Flexible connections This manual has been made with care ELWA remains the right to adjust products in the future for various reasons...

Страница 16: ...16 ELWA Pty Ltd ELWA Ltd ELWA BV Adelaide Australia New Zealand Phone 61 0 8 8353 4040 www elwa com au Auckland New Zealand Amsterdam The Netherlands Phone 31 0 20 436 1224 www elwa nl Ref 02 201606...

Отзывы: