Analysis
27
5.2 Analysis example
The analysis of steel and cast iron is generally carried out with approx. 500mg of sample
(normally grains or pieces) by adding 1,5 tungsten accelerator.
5.2.1 Combustion peak
The combustion is quite rapid and the peaks on the PC screen look as follows:
Fig. 13: Combustion peak
5.2.2 Combustion double peak
Fig. 14: Combustion double peak
The reason is that either the sample doesn't contain enough iron or the sample is made of metal
powder.
In this case take 2g tungsten instead of 1.5g. If the combustion still provides double peaks or
there is yellow dust on the inner surface of the crucible after the analysis, take 1g tungsten,
500mg pure Iron accelerator and 500mg sample.
In case of metal analysis the dust trap has to be cleaned and the moisture trap has to be
replaced every 100 analyses or at least every two days. See chapter
The combustion tube doesn't need any cleaning by the operator, due to automatic cleaning after
each analysis.
Содержание CS-2000
Страница 2: ...2 Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...
Страница 5: ...5 ...
Страница 63: ...Maintenance 63 Fig 35 Induction furnace Cone ...
Страница 80: ...Function description 80 Fig 51 Gas flow system ...
Страница 91: ...Miscellaneous 91 8 1 6 Furnace Fig 60 Furnace 71031 71010 ...
Страница 98: ...Miscellaneous 98 8 1 12 Tic module Fig 66 TIC module 35543 9008 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Страница 110: ...Copyright Copyright by Eltra GmbH Retsch Allee 1 5 42781 Haan Germany ...