
ELECTRICAL INSTALLATION
This appliance MUST be installed in accordance with the relevant wiring rules and
regulations and in particular those regulations which cover installation of appliances and
accessories in damp situations such as bathrooms, showers, laundries and other areas
with fixed water containers. It is to be fitted in accordance with applicable
Australian/New Zealand standards (AS/NZS).
In accordance with New Zealand’s wiring regulations this appliance is required to be
connected to a power supply that includes an earth circuit.
This appliance cannot be connected to a two wire (lighting) power circuit.
WARNING
:
In order to avoid a hazard for young children, this appliance must be
installed so that the bottom rail is at least 600 mm above the floor.
Special purpose tools are required for the replacement of the power supply cord.
Contact an Authorised Service Agent for service.
Please note that if mounting your Heated Towel Rail yourself contact your local
hardware professional for advice on the best mounting hardware for your walls, as this
may vary.
MOUNTING
Choose a suitable position on the wall to mount the Heated Towel Rail. The flex entry
must be horizontal and at the bottom of the frame.
Fit the leg brackets shown in figure 1.
Place the Heated Towel Rail on a flat surface, check that all the leg brackets are sitting
parallel, if not parallel, re-tightening may be required. Do not over tighten or parts of the
towel rail may break.
Line up the towel rail on the wall, screw the lugs onto the wall in the correct positions.
Place the legs over the lugs and tighten the grub screws to ensure the towel rail stays in
position on the wall.
SUPPORT AND TECHNICAL ADVICE
North Shore City, Auckland, New Zealand
Monday
– Friday 8am-5pm
Phone: 0800 232 633
Website: www.cdb.co.nz