Standard Alarm Relays & Digital Inputs
Connections
The alarm outputs in
Flatpack2
systems use the
Fail-Safe Operation Mode
(relay coils energized in
the system’s normal operation mode). When the
system is in alarm mode, the alarm relay coils are
de-energized.
The figure shows the position of the relay contacts
when the relay coils are de-energized (PS system
in alarm mode)
In order to implement monitored fail-safe digital
inputs circuits, the external relay coil must be
energized and the contacts closed in the system’s
normal mode of operation.
LVD Latching Contactors
Connections
Flatpack2
systems’ LVBD and LVLD
3
functionality is implemented with magnetically latching
contactors
4
.
The coil of latching contactors is not energized in any state. They change state from open to close,
or vice versa, when a reversed pulse is applied to the coil.
3
LVBD, Low Voltage Battery Disconnect; LVLD, Low Voltage Load Disconnect
4
Smartpack2
-based
Flatpack2
systems may be implemented with latching and with non-latching contactors
Appendix
Internal Connections
Standard Relays & Digital Inputs
Correct Use of Digital Inputs (example)
Normal Mode
External Relay Y
(Energized coil)
+
—
Digital Input X
(Normal mode)
Alarm Mode
External Relay Y
(De-energized coil)
+
—
Digital Input X
(Activated)
Flatpack2 PS System
Correct Use of Alarm Outputs (example)
Flatpack2 PS System
—
+
NC
NO
Com
Normal Mode
Relay X
(Energized coil)
+
—
Alarm Mode
Relay X
(De-energized coil)
NC
NO
Com
Latching Contactor A
Latching Contactor B
Bidirectional
diode
Warning!
The bidirectional
diode must
always be
mounted to avoid
damaging the
controller.
Y
X
Two Types of Latching Contactors
Y
X
Latching Contactors
A latching contactor changes state only when a
reversed pulse voltage is applied to its coil
+ Pulse
ON
- Pulse
OFF
Содержание Flatpack2
Страница 27: ...Quick Start Guide Flatpack2 PS System 4U SP2 based 356825 103 2v0 2011 09 27 ...
Страница 29: ...PULLOUT Check Lists Pullout Pull out the pages with the gray outer band and use them as check lists ...
Страница 34: ...PULLOUT ...
Страница 36: ...PULLOUT Check Lists Pullout Pull out the pages with the gray outer band and use them as check lists ...