36
Installation
, connection and commissioning
5.3.2 Sealing
5.3.2.1 External view
Ill.: 14
1
Optional user protection: Lid sealing
using wiring seals through sealing
plugs.
5.3.2.2 Internal view
Ill.: 15
Ill.: 16
1
Sealing point for securing the
calibration switch.
2
Sealing points for securing the plate
covers.
3
Sealing points for securing the terminal
covers of the inputs and outputs.
4
Sealing points for securing the battery
cover (if available).
5
Sealing points for securing the LCD
plate cover.
The sealing of the sealing points Ill.: 15/3 for securing the pulse inputs and pulse
outputs is subject to national law (see WELMEC 11.1, chapter 2.7.1).
Depending on the legal situation in the country of use, seals from a group of
people set out in law or from meter operators must be used.
If devices are delivered with connected input and/or output cables then seals
with the manufacturer's symbol are applied at the plant. If necessary, these can
be substituted on site as described above.
1
1
5
4
3
2
1
Содержание EK205
Страница 1: ...Operating manual Volume conversion device EK205 ...
Страница 6: ......
Страница 64: ...64 Appendix 9 2 Conformity declarations19 19 IECEx is not available for all device types ...
Страница 65: ...Appendix 65 9 3 Design test certifications 9 3 1 ATEX EC Type Examination Certificat ...
Страница 66: ...66 Appendix ...
Страница 67: ...Appendix 67 ...
Страница 68: ...68 Appendix 9 3 2 IECEx Certificate of Conformity20 20 Not available for all device types ...
Страница 69: ...Appendix 69 ...
Страница 70: ...70 Appendix ...
Страница 71: ...Appendix 71 ...