8
Commissioning
Sensor Sewi KNX L-Pr
• Version: 26.10.2021 • Technical Changes and Errors excepted.
4.
Commissioning
Brightness sensor, presence sensor and ventilation slots on the side must not be dirty,
painted over or covered.
After the bus voltage has been applied, the unit will enter an initialisation phase lasting
5 seconds. During this period, no information can be received or transmitted via the
bus.
The presence sensor has a start-up phase of approx. 15 seconds, during which the
presence of persons is not detected.
4.1. Addressing the equipment
The individual address is assigned via the ETS. For this purpose there is a button with
a control LED on the unit (Fig. 2, No. 4+5).
The equipment is delivered with the bus address 15.15.255. Another address can be
programmed using the ETS.
5.
Maintenance
As a rule, it is sufficient to wipe the device with a soft, dry cloth twice a year.
6.
Disposal
After use, the device must be disposed of in accordance with the legal regulations. Do
not dispose of it with the household waste!
Fig. 7
Connect the KNX bus to the KNX terminal.
Fig. 8
Close the housing by positioning the cover
and snapping it into place. To do this, align
the recess on the cover to the marking on the
skirting (the presence sensor must protrude
through the opening in the cover).
Содержание 70396
Страница 2: ......
Страница 11: ...9 Disposal Sensor Sewi KNX L Pr Version 26 10 2021 Technical Changes and Errors excepted ...
Страница 43: ......