3E-490046NI – 10/20
Page 3
EN
ELRO-Werke AG
Wohlerstrasse 47
5620 Bremgarten
LOCATING
ASSEMBLY ON INDIVIDUAL LEGS
The unit should be levelled using the adjustable feet (20mm spanner). Fig. 2.1A
→
2.1C
ASSEMBLY CANTILEVERED OFF A WALL
The unit should be levelled using the adjustable feet (20mm spanner). Fig. 2.3A
→
2.3F
The cantilever support must be able to take 400 daN (2 supports for an 1100 or 1400 unit). For units cantilevered off a concrete wall the
following are recommended:
* Reinforced concrete of a minimum quality of 23 MPA (DTU).
* Use rawl plugs such as HSA-R M 8 x 75 or equivalent.
* For the rawl plugs above the hole to be drilled should be 8 mm and to a depth of 65mm minimum.
ASSEMBLY ON A MASONRY PLINTH
The unit should be levelled using the adjustable feet (20mm spanner).Connect to electricity, gas, water and drain before fixing to the plinth
Fig. 2.4A
→
2.4G
Dimension for a wall or central island plinth
Am
Ls
Ac
Wall
Centrally
(side view)
(side view)
(front view)
Full tiled base
Lf: Stove width
Stove depth
Stove depth
Stove depth
Full tiled base
Full tiled base
Full tiled base
1 cm/m maximum slope
1 cm/m maximum slope 1 cm/m maximum slope
Finished
height with
tiled front
Finished
height with
tiled front
Plinth dimensions
Am
Wall plinth depth
Ac
Central island depth
Ls
Length
Finished height tiled to
the front
710 (before floor tile)
1420 (before floor tile)
Lf-50
110
A technical compartment is required if the stop cock, drain valve, or gas regulator are in the suite.
There are two solutions:
1) Neutral unit on a 200mm technical compartment.
2) A 400 tap cupboard with every possible cooing or neutral top, except induction.
Assembly of units on a masonry plinth
Ventilation
Services could run
along the front
Содержание PRECIPAN
Страница 2: ......