Elma DT5500A
side 28
Cables
Disconnect the cable from the line. Also disconnect opposite end to avoid errors due to
leakage from other equipment. Check each conductor to ground and /or lead sheath by
connecting one megohmmeter lead to a ground and /or lead sheather and the other
megohmmeter lead to each of the conductors in turn. Check insulation resistance between
conductors by connecting megohmmeter leads to conductors in pairs.