Required
S
teps
P
rior to
I
nstallation
www.ellasbubbles.com
0
3
/1
8
Place the tub on a completely flat surface in an area where it may be drained after
testing.
Using a clean rag and warm water wipe down seal to insure it is free of debris.
Seal the drain
s
(this can be done with tape) and fill the tub to at least three inches
above the highest jet, or to the bottom of the
grab
bar if no jets are present.
Allow the water to stand in tub for 30 minutes and then inspect all plumbing and seals for
leaks.
Using appropriately rated three-prong extension cords, all plugged in to separate outlets,
operate all electrical components (air blower, water pump, and heater if applicable) for
another 30 minutes and inspect for leaks again. Inspect the unions around the pump and
heater.
If a leak persists at a union after tightening, it may have been over-tightened or might
have a displaced O-ring. Disassemble it and make sure the O-ring was seated properly.
Do the same if a leak persists at the heater. Verify that the heater threads match the
pipe threads.
Protecting the Bath
Cover and protect the bath shell and fixtures from scratches or other damages during the
installation and tests. Remove the access panels when moving the Walk in Bath and
always lift the bathtub from the frame
.
Electrical
The unit MUST be connected to a circuit protected by a ground fault circuit interrupter
(GFCI) provided and installed by a licensed electrician and tested periodically (refer to
instructions provided by GFCI manufacturer). Electrical requirements vary based on
package; please refer to package diagrams included in the specifications. A licensed
electrician for your area is required to install and test the electrical installation process. DO
NOT use any kind of extension cords to power the unit.
Operating the pumps without first filling the bath to above the jets can cause permanent
damage to your equipment.
Push the GFCI “test” button into “reset” mode. If the GFCI fails to operate in this manner,
there is a ground current flow or a device malfunction, indicating the possibility of electrical
shock. If this occurs, turn OFF the power and do not use the bathtub until the source of the
problem has been identified and corrected.
Water Test
It is important
to test that the Hydro and Air Pumps are functioning
properly before final in-
wall installation to avoid unnecessary repairs or removal.
A.
B.
C.
D.
E.
F.
Содержание Deluxe 93057 L
Страница 7: ...Please heed all warnings listed in the previous pages to avoid potential issues...
Страница 14: ...Drain and Plumbing Positioning Options for 2 T Type Dual Port Drain Systems www ellasbubbles com 03 18...
Страница 15: ...www ellasbubbles com Drain and Plumbing Positioning Options for 2 T Type Dual Port Drain Systems...
Страница 16: ...www ellasbubbles com Drain and Plumbing Positioning Options for 2 T Type Dual Port Drain Systems...
Страница 27: ...4 Fold BathScreen Installation Instructions...