4
5)
Maintain the monitor paint as dictated by use and by the environment. The factory-applied paint is a red (RAL 3003) urethane enamel.
Страница 1: ...rel of the hydrant using the appropriate size U bolt 8 2 or 10 4 Place one nut on each side of the U bolt position the bracket as shown and tighten each nut hand tight 3 Attach the support bracket 10...
Страница 2: ...the ring gasket in the center of the elbow flange and set the monitor on the flange arranging the bolt hole patterns so they match see figure 3 Install the four 2 5 long bolts 14 through the monitor...
Страница 3: ...nd wheel with the spinner knob There is a visual valve position indicator located on the top of the gear actuator Maintenance 1 Move the monitor through its entire range of motion monthly At this time...
Страница 4: ...4 5 Maintain the monitor paint as dictated by use and by the environment The factory applied paint is a red RAL 3003 urethane enamel...