background image

97414C (Rev. K - 8/03)

ESRC8*1F, 2FJO, 3FJO  ESRC13*1F, 2FJO, 3FJO

PAGE 3

FIG. 3

Stream height is factory set at 35 PSI. If supply pressure varies greatly

from this, remove items 31 and 32 and adjust screw on item 34. Clockwise

adjustment will raise stream and counter-clockwise adjustment will lower

stream. For best adjustment, stream should hit basin approximately 6-1/2"

(165mm) from bubbler.

NOTE:

WHEN INSTALLING REPLACEMENT BUBBLER

AND PEDESTAL, TIGHTEN NUT (ITEM 12) ONLY

TO HOLD PARTS SNUG IN POSITION.

DO NOT OVER TIGHTEN.

BASIN

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

START UP

Also See General Instructions

8) Replace the front panel and secure by retightening all screws.

FIG. 4

10

11

12

8

9

WRAPPER

34

32

33

31

35

36

INSTALLATION OF COOLER AND TRAP

1) Hang the unit from the mounting box by placing tabs from the upper backside of the basin over top of the

     upper flange on the mounting box, and mount trap, as shown in Figure 2.

NOTE:

  Mounting box and trap MUST be supported securely.  Add fixture support carrier if wall will not provide adequate support.

IMPORTANT:

2)  Secure cooler in place by positioning fastening clips as shown in Figure 2 - Detail B.

3)  Install straight valve for 3/8 in. O.D. unplated copper tube.

4)  Remove the access panel on the underside of the cooler and set it aside.

5)  Connect water inlet line--See Note 4 of General Instructions.

6)  Remove the slip nut and gasket from the trap and install them on the cooler waste line making sure that the end of the waste

      line fits into the trap.  Assemble the slip nut and gasket to the trap and tighten securely.

All manuals and user guides at all-guides.com

Отзывы: