
1778
1778
A
8
7
9
STEP 1
Installing wall plate (A) to wall with
Anchors (8), washers (7)
and wall screw (9).
A
B
G
3
STEP 2
Put the extension tube (B) to wall
plate tube (A). Adjusting the distance
you needed, then tight with screw cap (3).
13
、
14
、
15
、
16
17
18
19
E or F
To install adjusting plate (E or F)
with correct size of
screw (
13
、
14
、
15
、
16
)
on the projector.
D
E or F
4
5
6
Installing platform base (D)
on the adjusting plate (E or F).
The screw (2) should face up
and go through platform base (D).
2
D
STEP 6
perforates hole
perforates hole
To route your cables from perforates
holes on tube.
STEP 5
D
C
B
1
4
Put the plastic cover (C) on the
top of platform base (D).
Then install the platform base (D) onto
extension tube (B) with brake screw.
6
12
5
11
10
Assembly steps
STEP 3
STEP 4
Elitech International USA
www.elitechusa.com