background image

 

 

Setup Procedure 

 

 

The frame and supports are made of 1 3/8” aluminum tubing with an anodized finish.  Please follow the instructions in 

this package.  With proper care, your QuickFold screen will provide many years of reliable service. 

 

 

Two Section Frame 

 

(For presentation screens that are less than 120” in diagonal measurement) 

 
 

1.  Take the frame out of the case and remove its wrappings. Unfold the 

main joints as shown in (fig 1). 

2. 

Once the main joints are unfolded, make sure that the snap latches 

“click”  into  the  locked  position.  The frame should now be 

fully elongated  as  in  (fig2). 

*Note: The snap latches will 

automatically lock when the joint is straightened.   Press the snap latch button in 

order to release the lock.

 

3.  While   holding   the   bottom   of   the   frame   in   place,   lift   the   

top  of  the frame  to  unfold  the  sides  which  will  cause  

the  snap  latches  lock when   fully   extended.   Secure t h e  

c o r n e r  b r a c e s   i n t o   t h e   l o c k e d  position. The  screen  frame  should 

now be fully opened as in (fig 3). 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

fig 1

 

 
 

 

Top

 

 
 
 
 
 
 

fig 2

 

 

 

Top

 

 

 
 
 

Snap latch

 

 

 
 
 
 
 
 
 

 

Lock down the corners

 

Snap latch

 

 

 
 
 
 
 
 
 
 

fig 3

 

Содержание QuickStand Series

Страница 1: ...Folding Presentation Screen QuickStand Series Users Guide...

Страница 2: ...2 Once the main joints are unfolded make sure that the snap latches click into the locked position The frame should now be fully elongated as in fig2 Note The snap latches will automatically lock whe...

Страница 3: ...2 Make sure that the snap latches have locked the joints in the frame so that it is at its full horizontal extension as shown in fig 5 3 While holding the bottom of the frame in place lift the top of...

Страница 4: ...appings Fold down the support legs as shown in fig 7 2 Secure the corner braces into the locked position as shown in fig 8 3 Unfold the T Leg s main support until the snap latches click into the locke...

Страница 5: ...ion during attachment unfold 2 3 Fig2 3 adjust the height of the frame and then tighten the connection screws unfold 1 Connection screws removable frame 2 unfold Lock down the corners locking bolt Sna...

Страница 6: ...r Packing Please observe the following precautions before folding up the screen material 1 Do not bring the viewing surface into contact with chemical solvents sharp or abrasive objects painted varnis...

Страница 7: ...m first then alternate in folding left to right until the material is of a sufficient size that will fit into the leatherette case Note Keep the screen material inside its case when not in use It will...

Страница 8: ...llowing points should be noted to assure satisfactory performance and longevity of your screen 1 Never use your exposed hand to touch the screen surface because of grease from the skin 2 Never scrabbl...

Страница 9: ...orted with in 7 business days upon receipt of the product After 7 days the Customer is responsible for all incurred costs Inspect all shipments upon arrival If damage or loss is apparent upon delivery...

Страница 10: ...any Tel 49 40 30392494 Fax 49 40 49219200 info elitescreens eu www elitescreens eu Latin America Contact erik garcia elitescreens com East Asia Contact info ea elitescreens com India Contact info indi...

Отзывы: