INSTALLATION INSTRUCTIONS FOR THE 12’6” WIDE MODEL
“TITAN 1200” RANGE
The contents of this carton are divided into the different frame assemblies that collectively
make up the completed unit.
It is recommended that each framework assembly is
fully
completed before moving onto the next.
The frames to be constructed are as follows:
Two side frames
Rear end frame
Door end frame
Roof vent: two frames for the 10’ and 12’, four frames for the 14’ and16’, and 6 for frames for the
18’ and 20’models.
Two doors, 610mm wide.
Louvre frame: 1 for 10’, 12’ 14’ and 16’. 2 for 18’ and 20’ models.
WE CAN NOW COMMENCE WITH THE ASSEMBLY
If you are building your own brick base please refer to the dimensions on of this booklet. It is rec-
ommended that a concrete footing is built to the laying of the bricks/blocks.
Excavate a trench about 9” wide and dig down to hard earth or clay. Fill the trench with 4” approx.
of hard-core and cover with a concrete mix, ensuring that the final concrete is level. You can now
lay the bricks/blocks on top of this to the desired height, usually 2 courses of standard brick above
ground level.
N.B. All base work must be level and square and built to the precise outside measurements given in
Base Dimension section earlier in the booklet.
(Key point).
Содержание TITAN 1200
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 11: ......
Страница 19: ...DOOR FRAME ASSEMBLY...
Страница 23: ...TOP HAT DETAILS...
Страница 31: ...TOUGHENED GLASS PLAN...
Страница 32: ...ELITE 0318...