
43
Connect phases L1, L2, L3 of the power supply and the neutral to the
energy meter. Connect the wire to each phase: U1; U2; U3 with the
smaller connectors 10/11; 12/13; 14/15. (Pins 10 and 11 are shorted.
You can use either pin 10 or 11 for voltage measurement).
5.
Attach the current measuring transformers to the each phase
inside the power distribution box.
Building
’
s main
power supply ca-
ble inside power
distribution box
Current transform-
To the energy
meter
N
U1
U2
U3
Содержание CityCharge Mini2
Страница 5: ...5 Chapter 1 INTRODUCTION...
Страница 11: ...11 Chapter 2 PREPARATION...
Страница 17: ...17 Chapter 3 INSTALLATION...
Страница 21: ...21...
Страница 47: ...47 Chapter 4 INITIAL STARTUP...
Страница 52: ...52 Chapter 5 SETTINGS AND TESTING...
Страница 62: ...62 Chapter 6 TROUBLESHOOTING...
Страница 65: ...65 Chapter 7 WARRANTY...