background image

 1

 

Public Electric Vehicle Charging station

 

CityCharge Mini2

 

Installation Manual

 

Elinta Charge, UAB | Partizanu g. 63M, Kaunas 50306, Lithuania | 

www.elintacharge.com

 

 

Содержание CityCharge Mini2

Страница 1: ...1 Public Electric Vehicle Charging station CityCharge Mini2 Installation Manual Elinta Charge UAB Partizanu g 63M Kaunas 50306 Lithuania www elintacharge com...

Страница 2: ...erials may be duplicated used or disclosed without prior written permission from Elinta Charge UAB Disclaimer This installation manual includes the latest information available at the time of printing...

Страница 3: ...omponents 20 EC Declaration of conformity 21 3 4 Charging Station unpacking 22 3 5 Tools and Consumables 23 3 6 Mounting Plate Preparation 23 3 7 Wall Mounting The Charging station 24 3 8 Connecting T...

Страница 4: ...ynamic Load Management Setup online optional 55 5 4 Payment Solution Using The Payter optional 57 5 5 Using The Payter Payment Terminal 58 5 6 Setting Up The Price Rules For Payter 59 TROUBLESHOOTING...

Страница 5: ...5 Chapter 1 INTRODUCTION...

Страница 6: ...ticular its warning notices and safety instructions Qualified personnel is those who based on their training and experience are capable of identifying risks and avoiding potential hazards when working...

Страница 7: ...n must be in accordance with the manufacturer s installation instructions and comply with all local codes 1 5 Important Safety Instructions Do not use this product if the enclosure or the EV connector...

Страница 8: ...rging station If there are any issues or need for re pairs contact Elinta Charge support team This equipment is intended only for charging vehicles that do not require ventilation during charging Plea...

Страница 9: ...cket Also known as the Mennekes it is a type of connectors that is used to charge Electric Vehicles in Europe IEC 62196 Europlug CEE 7 16 and CEE 7 17 Commonly found across Europe for 230V appliance S...

Страница 10: ...station indoors and in a non humid environment keeping it in its original packag ing until it is ready to be installed Storage temperature should be between 30 C and 60 C When moving or lifting the un...

Страница 11: ...11 Chapter 2 PREPARATION...

Страница 12: ...for installation common physical elements characterize every EVSE site design Some of the most common design elements to look for Power Rating of Charging Station Available Parking Space Number of So...

Страница 13: ...add new conduits to reach the EVSE Additionally the cost of installation can be reduced if the existing conduit has adequate capacity for EVSE Available Parking Space In addition to standard parking s...

Страница 14: ...tion make sure there is the possibility to share a network with the charging station Charging stations usually accept all common communication types Wi Fi LAN or GSM 4G Integration to Charging Platfor...

Страница 15: ...ical installation instructions Failure to do so may result in damage to the unit or personal injury This charging station has been designed for operation with the power supply systems TNC S TNS or TT...

Страница 16: ...2 kW 22 kW 44 kW 64 A 16 mm2 Note that these values are only recommendations each in stallation is different and the cable cross section should be calculated individually each time Warning failure to...

Страница 17: ...17 Chapter 3 INSTALLATION...

Страница 18: ...Type 2 charging sockets The bright animated LED screen and sidebars are visible even in the direct sunlight CityCharge Mini 2 comes with many great features such as Charging cable locking Short circu...

Страница 19: ...IP54 Temperature range 30 C to 50 LED charging display YES Smart Energy Meter YES MID RFID user control YES Internet communication YES Communication type GSM LAN WiFi Dynamic Load Management Optional...

Страница 20: ...al Components Communication Modem Electronics Power Supply MainBoard Cable Lock Actuator Charge Controllers behind Mainboard Smart Energy Meters Power Contactors RCM MainBoard Circuit Breaker Wire Ter...

Страница 21: ...21...

Страница 22: ...udes Charging Station CityCharge Mini 2 1 pcs Mounting metal plate 1 pcs Wall anchors 4 pcs Wall screws 4 pcs RFID tag 10 pcs Circuit breaker C80 1 pcs Residual Circuit Current Breaker 1 pcs Metal cab...

Страница 23: ...ws for the wall mounting 4 x screw anchors for the selected wall type 3 6 Mounting Plate Preparation Take the metal mounting plate out of the package Mount it on the wall with the specified screws Mea...

Страница 24: ...24 3 7 Wall Mounting The Charging station Make sure the mounting plate is securely fastened to the wall and the mounting plate hooks are facing up Hooks must be facing up...

Страница 25: ...curely holding the charger with both hands place the charging station on to the mounting plate The weight of the charging station is 21 kg It would be safer to have two people to hang the station on t...

Страница 26: ...ust first be inserted into the slots see picture below Slots Hooks Push down the charging station to secure the charging sta tion on to the hooks see picture below The hooks has en tered the the slots...

Страница 27: ...27 Secure the charging station to the mounting plate by hexagon screws provided 2 x screws Tighten these screws with the force of 10 Nm...

Страница 28: ...8 Connecting The Power Cable Unlock the lock on the underside of the charging station using the electrical housing key supplied with the charging station Unlock the lock by turning the key countercloc...

Страница 29: ...ation by lifting the front panel lift from the bot tom of the lid see illustration below Remove the front panel Be especially careful not to break the screen glass which is held inside the front panel...

Страница 30: ...tion is supplied with an optional LAN communi cation or an optional secondary power input all additional cables must be routed to the charging station using these metal glands If there are unused hole...

Страница 31: ...he Power Supply Cable neutral N to the blue wire terminal Connect the Power Supply Cable Earth wire PE to the green yellow wire terminal Make sure the front lid is grounded through the separate green...

Страница 32: ...minal Make sure that the service doors are grounded through the separate green yellow wire TN 1 phase connection to the grid L1 N PE IT network connection NOTE This charged is designed to operate on T...

Страница 33: ...charger s Phase 1 Connect L2 to charger s Phase 2 Connect L3 to charger s Neutral Connect the Power Supply Cable Earth wire PE to the green yellow wire terminal For TN 1 Phase connect L1 to charger s...

Страница 34: ...tyCharge Mini 2 is supplied with a single power input terminal The maximum permissible power cable cross section is 16 mm2 The wiring diagram below shows the single power connection The smart energy m...

Страница 35: ...wn in brown One power supply is for the A side while the other power supply is for the B side Connect both Power Supplies Cables neutrals N to the blue wire terminals Connect both Power Supplies Cable...

Страница 36: ...it to use two separate power inputs This can be ben eficial for installation purposes when using thinner cables for easier installation and or aesthetics It is possible to use two completely independe...

Страница 37: ...e should be long enough to reach the adapter inside the charging station Leave at least 50 cm of UTP cable length for the desired instal lation location Mount the RJ45 cable connector on the UTP ca bl...

Страница 38: ...metal gland provided with the charging sta tion 2 After passing through mount the RJ45 cable connector on the cable end 3 Connect the LAN connector to the LAN cable socket adapter located near the wir...

Страница 39: ...ood communication speed through mobile network GSM 3G 4G communication If the CityCharge Mini 2 is selected with the SM 3G 4G option the additional equipment is installed in the charging station Modem...

Страница 40: ...the SIM card into the tray 4 Push SIM card tray into the modem Make sure that The SIM card does not have PIN not set SIM card should have up to 200 megabytes data allowance per month Successful insert...

Страница 41: ...configuration settings 3 18 Alternative LAN Connection The charging station which is equipped with a GSM 3G 4G communica tion modem can alternatively be connected via an Ethernet LAN cable Simply plug...

Страница 42: ...g Station Installation Follow the steps below to install Dynamic Load Manage ment correctly 1 Make sure the charging station is turned off 2 It is recommended that the entire building power supply be...

Страница 43: ...smaller connectors 10 11 12 13 14 15 Pins 10 and 11 are shorted You can use either pin 10 or 11 for voltage measurement 5 Attach the current measuring transformers to the each phase inside the power...

Страница 44: ...current consumption does not exceed 300 amps per phase 6 Connect the red wire of current transformer T1 to the phase 1 input of the energy meter and the black wire to the phase 1 output Con nect the r...

Страница 45: ...additional wiring be tween the Smart Energy Meter and the charging station Use the standard UTP Ethernet cable or RS 485 twisted pair cable for the dynamic load management system 22 23 Contacts 22 23...

Страница 46: ...iagram is shown below 23 to the red wire inside the charger Wago connector 22 to the black wire inside the charger Wago connector The smart energy meter is completely set up to work with the charging...

Страница 47: ...47 Chapter 4 INITIAL STARTUP...

Страница 48: ...d STEP 1 Turn on electronics circuit breaker STEP 3 Go to your power distribution box and turn on the circuit breaker and residual current breaker 4 1 First Time Start UP STEP 4 Wait at least 5 10 min...

Страница 49: ...er screen displays the message Ready There is a possibility that the charging station is initiating a software update process which can be disrupted by switching it off immediately If the charger has...

Страница 50: ...ownload and installation process is complete Usually this process takes after a reboot or power failure Normally this step is skipped during the first boot up The blue frame around the screen should b...

Страница 51: ...he charging station to charge the EV Plug the charging cable into the charging station and the other end into the electric vehicle Activate the charging station by swip ing an RFID tag on the screen T...

Страница 52: ...52 Chapter 5 SETTINGS AND TESTING...

Страница 53: ...alternating fault currents and for pulsed DC fault currents whether they are applied quickly or rise slowly In many European countries there is a law that applies to the instal lation of EVSEs and re...

Страница 54: ...f use To test the RCD follow these steps 1 Stop all car charging 2 Disconnect all vehicles from the charging station 3 Go to the building power distribution box 4 Locate the corresponding RCD for the...

Страница 55: ...t s socket It does not take into account exact power consump tion If two cars are connected then power is split in half Local Dy namic Master One charger power balance depending on building pow er con...

Страница 56: ...ent spikes when using home appliances We recommend to leave approx 10 total building power for reserve In this example the charging station may use the power that Building power 32 A Dynamic reserve 1...

Страница 57: ...rge app using a credit card With the Payter contactless payment terminal The CityCharge Mini 2 can be selected with a Payter contactless payment terminal located at the front of the charging station j...

Страница 58: ...indicator 1 will light up and a beep will be heard Remove the contactless card from the reader The charging station locks the charg ing cable and the charging process begins To end the charging pro ce...

Страница 59: ...ed to set the price parameters 1 Open the web browser and go to elios cloud 2 Log in to the Elios platform with your username and password 3 Navigate to the Stations tab 4 From the list of the chargin...

Страница 60: ...et The client will be charged the standard price per minute rate when all the free minutes run out Free kWh If the price per kWh is set then the free kWh can be set in order to charge the client for e...

Страница 61: ...oup with the Save to group button 8 Lastly the charging station needs to be set as paid so it can use the settings you made earlier Navigate to the Edit tab 10 Click the Save button at the bottom of t...

Страница 62: ...62 Chapter 6 TROUBLESHOOTING...

Страница 63: ...service doors of the charging station Check that none of the circuit breakers or residu al current circuit breakers have tripped 3 Charging station can be acti vated but the charging pro cess does no...

Страница 64: ...EV outlet may be re sponsible for triggering RCD If the charger does not have an automatic RCD reset RCD should be reset manually 7 The charging process takes a long time Reduced charging current If t...

Страница 65: ...65 Chapter 7 WARRANTY...

Страница 66: ...ace free of charge defects that occur due to the manufacturer s error during the warranty period All warranty terms apply in accordance with consumer protection laws 2 Before using the product read th...

Страница 67: ...to changing operating conditions integration or changing components 4 Fixing Faults in the power input circuit 7 4 In Case of Breakdown 1 Turn off the charging station and do not use it 2 Note the se...

Страница 68: ...please contact the company that installed the unit or the technical support department of Elinta Charge 2 This document does not limit the rights of the consumer to the warranty if the purchased produ...

Отзывы: