background image

Содержание Z16 Series

Страница 1: ......

Страница 2: ...e assembly on manual sledges carriage and back stop systems 12 months in continuous operation Including sensor for magnetic length measuring system Simple operation and assembly LCD Display with integ...

Страница 3: ...rriage 12 5 2 Technical Data 13 6 Installation 14 6 1 Qualifications of the Staff 14 6 2 The Sensor 14 7 Structure and Function 15 7 1 Arrangement of the LCD Display 15 7 2 Selecting parameters and in...

Страница 4: ...for better representation of the facts they are not necessarily to scale and can be slightly different to the actual construction 1 2 Explanation of Symbols Warning notices Warning notices are charact...

Страница 5: ...ilous situations by electricity By non observance of the safety instructions the possibilities of death or severe injuries exist The operations have to be carried out only by an electrician 1 3 Statem...

Страница 6: ...Recycle the decomposed elements Scrap metal elements Recycle plastic parts Dispose the rest of the components according to their material consistence ATTENTION Wrong disposal damage caused to the env...

Страница 7: ...oyees should wear protective clothing during installation of the device to minimize the risk of accidents Therefore Change into protective clothing before beginning the work process Also observe any l...

Страница 8: ...ictly follow this manual Avoid in particular Remodelling refitting or changing of the device or parts of it with the intention to alter functionality or scope of the position indicator ELGO is not lia...

Страница 9: ...complaint immediately ADVERT Claim any damages you recognize as soon as possible The claims for damage must be filed in the lawful reclaim periods 3 4 Storage Store device only under following condit...

Страница 10: ...e necessary electrical Information current position The head of the sensor with its security class Is resistant for any type of dust dirt or water jet and absolutely use resistant The indicator contai...

Страница 11: ...10 5 Technical Data 5 1 Dimensions 5 1 1 Dimensions Indicator 20 72 5 Battery chamber Sensor 36 5 1 2 Dimensions Sensor Technical Data...

Страница 12: ...contained in the shipping together with the rear panel of the unit It is turn able and can put thus the Z16 in any slopes in order to enable the user the optimal reading With the 2 boreholes shown in...

Страница 13: ...x h 80 x 48 x 25mm The guide rail F520 25 is an aluminium profile with integrated chase in which the magnetic tape is pasted Additionally the matching guide carriage FW20 60 made of rubber which allow...

Страница 14: ...panel outbreak W x H 92 x 66 mm Protection class IP 43 installed Magnetic Sensor MS20 25 Sensor cable length 0 1 m up to max 2 0 m more on request Resolution 0 1mm Protection class IP66 Zinc die cast...

Страница 15: ...l 6 2 The Sensor The sensor integrates the magneto resistance test bridges from which addicted to the track the counts for the signal processing electronic are formed The distance between the sensor a...

Страница 16: ...le parameters can be successive selected 7 2 2 Accessing the Decade Set 1x press With this button the Decade will be forwarded at 1 point from the left to the right The selected Decade is blinking 7 2...

Страница 17: ...01 Inch Counting direction B 0 positive B 1 negative 01 P03 A Decimal point 0 3 1 P05 AB Key lock A Button SET 0 active 1 not active B Button Incr Abs 0 active 1 not active 00 P08 Multiplication facto...

Страница 18: ...ration display CAL 0 CAL 4 is the display again in normal mode 7 2 2 Loading the Default Parameter The Sensor must be installed on the Magnetic tape Switch off the unit Incr abs press this button Whil...

Страница 19: ...ssible if no offset level is activated The reference value is entered in parameter P09 7 3 2 Switching incremental absolute incr abs 1x press With this key the unit switch from absolute mode to increm...

Страница 20: ...t circuit simultaneously This increases significantly the safety of function against extreme external magnetic influences A and B are supplied united from the factory C In order to receive the flexibi...

Страница 21: ...nd instructed personnel Prior to the beginning of work provide sufficient room to assemble the equipment Please look for cleanliness at the place of installation loosely around laying parts and tools...

Страница 22: ...follows 1 Add RC elements over contactor coils of AC contactors for example 0 1 F 100 2 Add recovery diodes over DC inductances 3 Add RC elements over each drive phase in connector box of the drive 4...

Страница 23: ...used arteries in signal lines should be isolated from each other separately isolate signal and power lines separately in long parallel lines a distance of 300 mm is respected therefore should never be...

Страница 24: ...nsor cable length e g 02 0 2 0 meter max Length 2 0 meter Options N without housing 11Accessories MB20 25 10 1 R Magnetic tape MB 20 25 10 1 R Series MB20 incremental Magnetic tape Pole pitching 25 2...

Страница 25: ...1 L O Operation manual 3 M Maintenance 23 P Parameter 17 Protection clothing 6 Purpose of Use 7 R Reference value 19 S Security 6 Storage 8 Suppress interferences 22 Symbols 3 T Technical Data 14 Tran...

Отзывы: