Elgas EQZ Скачать руководство пользователя страница 5

 

the measuring insert. 

2.3  Installing the meter onto the monopipe adapter EAS 

 Prior to the installation of the meter, the measuring insert should be inspected to 

ensure that no damage has been inflicted on the meter during transportation. 
Accessories should be inspected for completeness (e.g. Pulse generator). Faulty 
components should be replaced. 

 The measuring insert is delivered in special protective packaging. This should only 

be removed shortly before installation. 

 

Installation of the meter is possible horizontally or vertically (if over-run brake is applied, 
only horizontal position with counter on top is allowed); the meter head can be rotated 
in 90° steps. It should however, always be ensured that the axis of the roller counter is 
horizontal (i.e. volume value can be read). The meter must  not be installed upside 
down.

 

 

 Before mounting the meter onto the EAS, make sure that the pipeline has been 

flushed and is clean. If not please refer to section 2.2 "Cleaning of the pipeline prior 
to measuring insert installation". 

 The gas should be dry and free of dirt and dust. Particles may not be larger than 

5Microns. Otherwise, we urgently recommend the installation of a dust-moisture trap. 

 In case of new systems, the temporary installation of a filter or cone screen (mesh 

width: 0,5  mm) is recommended in order to protect the meter. The cone screen 
should be removed after 4 weeks. 

 The O-rings mounted on the meter must be firmly seated and must not be damaged 

during installation. 

 The meter is mounted to the EAS by tightening the cylinder screws is a crosswise 

manner. Please keep to the recommended tightening torque: 
Nominal Diameter      DN   50 =   40 Nm 
Nominal Diameter      DN   80 =   65 Nm 
Nominal Diameter      DN 100 = 100 Nm 

Only the ELGAS, s.r.o. delivered screws may be used for this purpose. 

Содержание EQZ

Страница 1: ...Radial blade turbine gas meter TRZ Radial blade turbine Quantometer EQZ EQZK Installation and operating instructions May 2018 Rev 1...

Страница 2: ...asuring insert installation 4 2 3 Installing the meter onto the monopipe adapter EAS 5 2 4 Pulse generators 6 2 5 Electrical connection of pulse generator 7 3 Commissioning 7 3 1 Maintenance and servi...

Страница 3: ...n and operation of Radial blade turbine gas meters type TRZ and Quantometer type EQZ EQZK They supplement the relevant national regulations with respect to the manufacturing and equipment of measuring...

Страница 4: ...rrect torque rating No screws can be left out The preferred installation position is horizontal with the roller counter on top Remark In the case that gasmeter is provided with over run break only thi...

Страница 5: ...eter must not be installed upside down Before mounting the meter onto the EAS make sure that the pipeline has been flushed and is clean If not please refer to section 2 2 Cleaning of the pipeline prio...

Страница 6: ...capacity negligibly small Lieffective internal inductivity negligibly small MF Namur Sensor optional pulse value 1m3 per 100 pulses For use within explosive sensitive areas with gas steam and mist II...

Страница 7: ...the pulse generator and the permissible maximum electrical values are displayed The cable is correctly connected when the circular plug is inserted into the socket and is fastened by tightening the co...

Страница 8: ...sent for scrap metal use 5 Information for installation in explosive areas Markings on the complete meter as an explosion proof operating device for TRZ Ex II 2G IIB T4X Tamb 10 C 55 C for EQZ EQZK Ex...

Страница 9: ...9 used provided that they meet the above mentioned requirements 6 Detailed description type plate...

Страница 10: ...10 7 Declaration of Conformity...

Страница 11: ...11...

Страница 12: ...QZ EQZK Installation and operating instructions Prepared by Collective of authors Issued by ELGAS s r o Ohrazenice 211 533 53 Pardubice Czech republic Phone 420 466 414 500 511 Fax 420 466 411 190 htt...

Отзывы: