Elektrogas VML2 Скачать руководство пользователя страница 8

 

 

8

 

Printed in Italy - EE162/0704

 

15- Maintenance 

To maintain a good performance of the system, almost 
once a year, an inspection of the valve is recommended. 

 

External inspection 

Turn off all power before servicing any part of the 
system. 

Check the conditions of the terminal board gasket. If 
gasket is deteriorated, replace it with a new one. 

Check the electrical connections are clean, dry and 
correctly tightened.  

Check the conditions of pipe connections: cover them 
with a soap solution and check for leakages. 

 

Internal inspection 

To make an internal inspection of the valve, do the 
following: 

1.  Close ball valve upstream the system. 

2.  Remove the coil like shown in the section 14. 

3.  Using an Allen key, remove the screws on the upper 

flange, in cross way. The gas in the valve will come 
out during this step. 

4.  Check the hydraulic brake is free of oil leakages 

(small leakages are admitted). If it’s necessary, 
replace it with a new one. 

5.  Check the main O-ring and, if it’s necessary, replace 

it with a new one. 

6.  Clean the internal side of the stem with a clean cloth 

and compressed air. 

7.  Remove the spring and blow it with compressed air. 

Check the spring is corrosion free. Take attention to 
the assembly direction of the spring. 

8.  Check the wear conditions of the sliding rings and, if 

it’s necessary, replace them. 

9.  Clean the sealing disc assembly with a clean cloth 

and compressed air. 

10.  Check the conditions of the sealing gasket. If gasket 

is deteriorated, replace it with a new one. 

11.  Clean the sealing lip with a clean cloth. Do not use 

tools, because a lip damage could result. 

12.  Remove the filter and blow it with compressed air. 

13. Check the O-ring on the top of stem and, if it’s 

necessary, replace it. 

14. 

Reassemble the valve following the inverse 
sequence. 

 

To assemble the sliding rings, wind them onto a lower 
diameter (ex. Screw driver), then insert them from the 
top. 

When reassembling, take attention to the correct 
position of the sliding rings and spring. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 8 

 

When the reassembly is finished, verify the correct 
sealing between the upper flange and the valve body: 

1.  Open ball valve to restore pressure into the valve. 

2.  Apply a soap solution between the upper flange and 

the valve body and check for leakages. 

3.  Remove the soap solution with a clean cloth, before 

to reassemble the coil. 

 

WARNING 

 

When reassemble, use all gaskets properly. 

 

Perform functional test after mounting. 

 

All works must be executed by qualified 

technicians only and in compliance with local 
and national codes.

 

 

 Cap

 O-ring

 Stem

 Screw

 Upper 

flange

Main O-ring

 Spring

Sliding ring

 Plunger

Disc + gasket

 Filter

G1/4”  plug

Coil assembly

 Valve 

body

Brake

O-ring

Содержание VML2

Страница 1: ...Printed in Italy EE162 0704 VML Solenoid safety valves for Air and Gas Slow opening and fast closing type DN10 DN80 VML2 VML4 Certified Quality System www elektrogas com...

Страница 2: ...table flow rate rapid stroke and opening time Qualified for continuous service 100 ED and endless ON OFF cycles Coil insulation is class H 180 C Terminal box with PG connector The large models are pro...

Страница 3: ...provided too 5 Coil features The continuous service 100 ED causes inevitable coil heating depending of working environment This situation is absolutely normal and has not to worry To improve the coil...

Страница 4: ...nections Overall Dimensions mm Model Threaded Flanged Maximum Pressure mbar Power Consump 230VAC W A B C D Int h Weight Kg VML0 Rp 3 8 360 20 88 77 180 196 1 8 VML1 Rp 1 2 360 20 88 77 180 196 1 8 VML...

Страница 5: ...DN 80 m h 1 1 2 3 8 3 4 1 1 2 Town gas Natural gas Air 8 Loss of pressure Formula of conversion from air to other gases 15 C 1013 mbar dry Gas type Specific gravity kg m K Natural Gas 0 80 1 25 Town...

Страница 6: ...225 85 Rp 1 340 125 Rp 1 475 160 Rp 1 610 200 50 Rp 2 1100 250 50 DN 65 1600 50 DN 80 2400 50 Fig 4 Valve may be mounted with coil in horizontal or vertical position Coil may be oriented 360 degrees...

Страница 7: ...n the screw located on the side of the brake One fourth of a turn clockwise increases opening time by 2 3 s up to a maximum of about 25 s slow run Factory setting is about 12 14 s WARNING Perform the...

Страница 8: ...spring 8 Check the wear conditions of the sliding rings and if it s necessary replace them 9 Clean the sealing disc assembly with a clean cloth and compressed air 10 Check the conditions of the sealin...