4
5
6) Direction rule
The right
-
side fixed barrier gate installation rule
:
The bar inside the gate
7) Installation
,
debugging and usage
Installation of mechanism part
7
.
1
.
1
)
Please select the right type of the barrier gates according
to the specifications of the place
.
Fix the barrier gate case
L
board with expansion bolts
(
refer to the fig
.
3
)
H
Reference size
Expansion bolts
Outside the gate
Barriers fix at right side of the gate
Fig
.
1
Fixation of R
-
type case
Reference size
The barrier gate fix at the right hand side of the access
The left
-
side fixed barrier gate installation rule
:
The bar inside the gate
Bar is inside the gate
L
H
Barriers case board
Fig
.
3
Fix the boom to the boom tray with the boom press board
,
then cover the boom capuche with the screws
.
After that
,
fix
the cover of the boom to the splint and fasten them with
four screws of 4×16
,
and slip the cover tap to the
correspondent hole in the boom cover
.
Finally
,
fasten the
cover tap with the cover by two 3×10 screws
.
Unlock the clutch device with the clutch key clockwise
.
Move
the boom to the horizontal and vertical position manually to
make sure there is no obstruction
.
Then turn on the power
(
refer to the Fig
.
4
)
Barrier fix at left side of the gate
Fig
.
2
The barrier gate fix at the left hand side of the access
Fig
.
4
Lock
Unlock