11
Installation
6681
2
6683
3
1
2
3
Installation
Transportation and unpacking,
WD4130, WD4240
The machine is delivered complete with expan-
sion bolts etc. packed inside the machine in the
drum.
The machine is delivered bolted onto the
transport pallet and packed in a crate or box.
• Remove packing from the machine.
• Remove front and rear panel. Remove the
bolts between the machine and pallet.
• Mount front and rear panel.
• Mount the feet.
• Place the machine on its final position.
• Level the machine with the feet of the
machine.
The machine also comes with transport safety
devices (two plate angles between the support
and the drum).
In order to remove the safety devices:
• Remove the two side panels.
• Remove the two transport securities.
• The machine may not be moved with the
transport securities removed. Save the trans-
port securities for future use.
6682
1